ABM, S.C. District Partner on Energy Performance Contracting Program

Facility solutions provider ABM recently announced that it has initiated an Energy Performance Contracting Program with the Abbeville County School District (ACSD) in South Carolina. A news release reports that the solution will modernize facility infrastructure in all the district’s schools and save the district about $4.9 million in energy and operating costs over the next 15 years. It will also offer general fund relief necessary to invest in future learning initiatives while also allowing the district to improve learning environments and improve indoor air quality for students and staff.

“The pandemic highlighted infrastructure needs nationwide, but it also required schools to invest more in alternative learning, teachers, and technology,” said ABM Technical Solutions President Mark Hawkinson. “We can do more for schools today than save them energy costs. We deliver solutions that address the capital investment needs and operating cost challenges schools face so they can best use funds for the benefit of students and teachers.”

The project will offer all eight ACSD schools and its Adult Education and Career Centers improved lighting, HVAC, and water conservation upgrades, as well as variable refrigerant flow units, to help the district save money. The flow units are designed to increase ventilation from outdoor air and provide bipolar ionization technology to increase indoor air quality.

Other solutions provided include building controls; sensors to measure outdoor air conditions as a method of maximizing system efficiency; and seismic, wind, and vibration hardware for hurricane and earthquake protection.

ABM has implemented its Energy Performance Contracting Program in more than 500 K–12 districts around the country to allow them to invest in important facility upgrades without drawing new funds from the community.

“We didn’t have a way to equitably upgrade our schools for all our students with our current spending structure,” said ACSD Superintendent Dr. Mason Gary. “ABM was able to put together a project that helped us better allocate our ESSER funds, transform our capital budget into an investment in our community assets, and free up our general fund to invest in teachers and educational initiatives for our students.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • FGCU Breaks Ground on New Health Sciences Building

    Florida Gulf Coast University (FGCU) has launched construction on a major new academic facility that leaders say will reshape healthcare education in Southwest Florida for decades to come, according to university news.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • Photo courtesy of Kraus-Anderson

    Minnesota District Completes $49.7M Addition, Renovation Project

    St. Paul Public Schools in St. Paul, Minn., recently announced the completion of a $49.7-million addition and remodeling project at two district schools, according to a news release.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.