ABM, S.C. District Partner on Energy Performance Contracting Program

Facility solutions provider ABM recently announced that it has initiated an Energy Performance Contracting Program with the Abbeville County School District (ACSD) in South Carolina. A news release reports that the solution will modernize facility infrastructure in all the district’s schools and save the district about $4.9 million in energy and operating costs over the next 15 years. It will also offer general fund relief necessary to invest in future learning initiatives while also allowing the district to improve learning environments and improve indoor air quality for students and staff.

“The pandemic highlighted infrastructure needs nationwide, but it also required schools to invest more in alternative learning, teachers, and technology,” said ABM Technical Solutions President Mark Hawkinson. “We can do more for schools today than save them energy costs. We deliver solutions that address the capital investment needs and operating cost challenges schools face so they can best use funds for the benefit of students and teachers.”

The project will offer all eight ACSD schools and its Adult Education and Career Centers improved lighting, HVAC, and water conservation upgrades, as well as variable refrigerant flow units, to help the district save money. The flow units are designed to increase ventilation from outdoor air and provide bipolar ionization technology to increase indoor air quality.

Other solutions provided include building controls; sensors to measure outdoor air conditions as a method of maximizing system efficiency; and seismic, wind, and vibration hardware for hurricane and earthquake protection.

ABM has implemented its Energy Performance Contracting Program in more than 500 K–12 districts around the country to allow them to invest in important facility upgrades without drawing new funds from the community.

“We didn’t have a way to equitably upgrade our schools for all our students with our current spending structure,” said ACSD Superintendent Dr. Mason Gary. “ABM was able to put together a project that helped us better allocate our ESSER funds, transform our capital budget into an investment in our community assets, and free up our general fund to invest in teachers and educational initiatives for our students.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

Digital Edition