Blue Ridge Elementary School

WRA Architects

Project of Distinction 2022 Education Design Showcase

Blue Ridge Elementary School

Project Information

Facility Use: Elementary School
Project Type: New Construction
Category: Whole Building / Campus Design
Location: Blue Ridge, TX
District/Inst.: Blue Ridge ISD
Chief Administrator: Matt Kimball, Supt. of Schools
Completion Date: July 2021
Gross Area: 73,000 sq. ft.
Area Per Student: 146 sq. ft.
Site Size: 9 acres
Current Enrollment: 470 students
Capacity: 700 students
Cost per Student: $31,185
Cost per Sq. Ft.: $299
Total Cost: $21,829,747

Blue Ridge Elementary School gathering area

A new elementary school for a growing district in rural Collin County, Texas. Incorporating the sloped site into the design, the academic wing will project from the hill, providing a covered outdoor learning area below. The main corridor connects all functions of the school while providing ample amounts of natural light. Secure after-hours access to the gymnasium and cafeteria allows community use. The Cafetorium has expansive glass walls offering wide views outside. Completed Summer 2021.

Blue Ridge Elementary School playground

Education Cycles — Just as there are cycles in nature where each step in the cycle is connected to the next, so there are connections in the educational journey.

Blue Ridge Elementary School library

Each point along the path that a student follows is directly connected to the milestone before it, as well as to the next milestone to come. This path continues through every aspect of a student's education, weaving from the academic core to the arts to physical play.

Blue Ridge Elementary School gathering area

The interior design for the project depicts this path as a "ribbon" woven throughout the school building. Main destinations along the way represent different phases in the water cycle, such as precipitation, absorption through plants, and evaporation.

Blue Ridge Elementary School library

Blue Ridge Elementary School staircase

Blue Ridge Elementary School from the outside

Architect(s):

WRA Architects
Jason Oswald, AIA, Principal-in-Charge
214-750-0077

Featured

  • Dallas-Area District Debuts Three New Facilities

    The Duncanville Independent School District in southwest Dallas, Texas, recently held ribbon-cutting ceremonies for three new facilities that resulted from a $170-million bond program passed in 2023, according to a news release.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.

  • TCU Marks Campus Expansion Milestone

    Texas Christian University in Fort Worth, Texas, recently held a topping-out ceremony to mark progress on a major campus expansion effort including four new residential facilities and a five-story parking garage, according to a news release.

  • Wold Completes Geothermal Projects at Two Minnesota Schools

    Wold Architects & Engineers recently announced that it has completed two geothermal expansion projects for Mounds View Public Schools in Shoreview, Minn., according to a news release. The work at Highview Middle School and Irondale High School serves the district’s long-term goal of reducing energy costs and dependency on non-renewable fuel sources, as well as improving building performance.