Quattrocchi Kwok Architects Leadership Transition

Quattrocchi Kwok Architects (QKA), based in Santa Rosa, Calif., recently announced a leadership transition that will take effect on Jan. 1, 2023. A news release reports that the architecture firm’s Founding Principals—Mark Quattrocchi, FAIA, and Steve Kwok, AIA—will take on Principal Emeritus status, continuing to work with select clients and offer mentorship while moving away from direct leadership.

QKA Principals Aaron Jobson, Jim Theiss, John Dybcak, Lyanne Schuster, Kevin Chapin, and Nick Stephenson will take on management and strategic planning responsibilities while also continuing with their existing roles in client service. Jobson, Thiess, and Dybczak are long-serving QKA Principals, while Schuster, Chapin, and Stephenson recently assumed those titles, the news release reports.

“We take profound pride in the integrity, quality, and culture that Mark and Steve have instilled in the fabric of our firm,” said Jobson. “The values and vision they established have been instrumental in the success and ongoing progress the firm has enjoyed throughout its history. My fellow principals and I view this next chapter as an opportunity to utilize this framework as we embrace the challenges and opportunities of the moment, continuing the firm’s evolution and building on our work in designing exceptional learning environments that have a positive impact on their communities.”

Jobson joined QKA in 2001 and will take on the role of CEO and President. Theiss joined in 2000 and will serve as COO. Finally, Dybczak joined in 2013 and will become the CFO. The three spearheaded QKA initiatives like the Employee Stock Ownership Plan and the JUST Scorecard for transparency and equity.

Other promotions and transitions will include Eddie Van Slambrouck, who will take over for Quattrocchi as director of design. Tiffany Young will move up to the position of director of operations, and Claudia Tannehill will serve as the director of construction.

“As our firm has grown, the cultivation of leadership is a vision we have long held for its future,” said Quattrocchi. “We have complete confidence that the next generation of QKA leadership will continue to drive innovation internally, as they have in our DEI awareness and efforts, and in the design of education facilities. It is with enthusiasm that we look forward to the future of a firm that represents so much for Steve and me.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Wold Completes Geothermal Projects at Two Minnesota Schools

    Wold Architects & Engineers recently announced that it has completed two geothermal expansion projects for Mounds View Public Schools in Shoreview, Minn., according to a news release. The work at Highview Middle School and Irondale High School serves the district’s long-term goal of reducing energy costs and dependency on non-renewable fuel sources, as well as improving building performance.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.

  • California District Debuts New High-School CTE Center

    The West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently held a ribbon-cutting ceremony for the new CTE Center at Analy High School, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) for the facility’s design and GCCI for its construction, and funding came from local Measure A bond funds.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.