ABM Offers $3.7M in Energy Savings to Georgia School District

Facility solutions provider ABM recently announced that it will be partnering with the Dooly County School System in Vienna, Ga., to form an Energy Performance Contracting program. The program will save the school district about $3.7 million in energy and operating cost savings over the next 20 years, according to a press release. The savings will come primarily from energy-saving infrastructure solutions and custodial and maintenance services.

“Our students deserve state-of-the-art facilities,” said Dooly County School System Superintendent Dr. Craig Lockhart. “This project, through an innovative solution, helps our community achieve more for each school, to perpetuate success for every student.”

The energy savings and reduction in operating costs will come through improved lighting, HVAC equipment, and controls at the district’s K–8 Academy and high school. It will also offer larger space for bus maintenance and upgrades to student athletic facilities such as additional bathrooms, new lighting, and improved playing surfaces. The project will also entail installing a new roof for the high-school gymnasium and a reconfigured HVAC system to extend the roof’s life and offer interior climate control.

“We not only improve infrastructure through projects like this for our clients, but we also protect and preserve those investments for students, teachers, and staff with ongoing maintenance and custodial services,” said ABM President of Education Valerie Burd.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UT System Board of Regents Approves $108M Housing Complex

    The University of Texas System Board of Regents recently announced the approval of a new, $108-million housing complex at the University of Texas at El Paso (UTEP), according to a news release. The facility will stand four stories and have a total of 456 new beds for freshmen students.

  • Benson Polytechnic High School in Portland, OR

    Preserving Legacy, Designing for the Future

    As historic academic buildings age, institutions face a difficult decision: preserve and adapt or demolish and rebuild. How do we honor the legacy of these spaces while adapting them to meet the needs of modern learners?

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.

  • Wisconsin District Breaks Ground on New Elementary School

    The School District of La Crosse in La Crosse, Wis., recently broke ground on a new elementary school that will consolidate the students and staff of two existing schools, according to local news. Funding for the school comes from a $53-million referendum approved in 2024.