Kraus-Anderson Completes $122M Career Academy High School

The office of Kraus-Anderson Construction Company in Duluth, Minn., recently announced that construction is complete on the new Rock Ridge Career Academy High School in Virginia, Minn. According to a news release, the school measures in at 280,000 square feet and was designed by Cuningham Group Architecture and local firm DSGW Architects.

Amenities include an open main commons area; active learning studios and lab spaces; a CTE center; and labs for carpentry, metals, automotive work, culinary arts, and certified nursing assistant (CNA) skills. It also features a pool, gymnasium, and small- and large-scale collaboration spaces.

The school offers a wide variety of career tracks within three academies. According to the news release, the career tracks include “(1) Business Management, Administration, Arts, Communications and Information Systems; (2) Health and Human Services; and (3) Agriculture, Food, Manufacturing, Construction, Engineering and Science.” The news release reports that Rock Ridge Career Academy High School serves as the only wall-to-wall career academy school in the U.S. north of the Twin Cities area.

“Rock Ridge High School was built to be a world-class school. It was specifically designed for both direct instruction and project-based learning to flourish as teaching and learning tools in a career academy structure for all students,” said Rock Ridge Public Schools Superintendent Dr. Noel Schmidt. “It is no hyperbole to say that the community, teachers, and students can be proud of this extraordinary high school, which will be the envy of many districts throughout the State of Minnesota and United States. It is that unique.”

The school’s construction began in 2020, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Greenheck Launches Optics Sensors for Kitchen Hoods

    Greenheck recently announced the launch of factory-installed optics sensors as an enhanced option for its kitchen ventilation hoods, according to a news release.

  • Creating a First and Lasting Impression with Thoughtful, Sustainable Design

    Clemson University’s Nieri Family Alumni and Visitors Center serves as the new front door to campus, anchoring the Tiger experience through each step in the student journey.

  • University of Kentucky Stormwater Harvesting System Receives Award

    The Utilities and Energy Management team from the University of Kentucky recently received a Grand Award at the 2025 Engineering Excellence Awards, according to a university news release. The award from the American Council of Engineering Companies of Kentucky was for the university’s Central Utility Plant (CUP) Stormwater Harvesting System, which activated in fall 2023.

Digital Edition