Kraus-Anderson Completes $122M Career Academy High School

The office of Kraus-Anderson Construction Company in Duluth, Minn., recently announced that construction is complete on the new Rock Ridge Career Academy High School in Virginia, Minn. According to a news release, the school measures in at 280,000 square feet and was designed by Cuningham Group Architecture and local firm DSGW Architects.

Amenities include an open main commons area; active learning studios and lab spaces; a CTE center; and labs for carpentry, metals, automotive work, culinary arts, and certified nursing assistant (CNA) skills. It also features a pool, gymnasium, and small- and large-scale collaboration spaces.

The school offers a wide variety of career tracks within three academies. According to the news release, the career tracks include “(1) Business Management, Administration, Arts, Communications and Information Systems; (2) Health and Human Services; and (3) Agriculture, Food, Manufacturing, Construction, Engineering and Science.” The news release reports that Rock Ridge Career Academy High School serves as the only wall-to-wall career academy school in the U.S. north of the Twin Cities area.

“Rock Ridge High School was built to be a world-class school. It was specifically designed for both direct instruction and project-based learning to flourish as teaching and learning tools in a career academy structure for all students,” said Rock Ridge Public Schools Superintendent Dr. Noel Schmidt. “It is no hyperbole to say that the community, teachers, and students can be proud of this extraordinary high school, which will be the envy of many districts throughout the State of Minnesota and United States. It is that unique.”

The school’s construction began in 2020, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Montclair State University Debuts New VR Facility

    Montclair State University in Montclair, N.J., recently announced the completion of a new virtual reality learning facility developed in partnership with Dreamscape Learn, according to a news release. The 2,450-square-foot lab space is inside the College of Communication and Media building and will serve students pursuing careers in digital media, virtual reality, and content creation.

  • California District Opens New Continuation High School

    The Fort Bragg Unified School District (FBUSD) in Fort Bragg, Calif., recently held a ribbon-cutting ceremony for Noyo High School, a continuation high school that provides alternative education options for students in grades 6–12, according to a news release. The district partnered with Quattrochi Kwok Architects for design and FRC Inc. for construction, and the project’s funding came from Local Bond Measure B.

  • DLR Group Hires Three for Higher Education Practice

    Integrated design firm DLR Group recently announced that it has brought three new hires on board to help shape its higher education practice in California and the northeast, according to a press release.