Kraus-Anderson Completes $122M Career Academy High School

The office of Kraus-Anderson Construction Company in Duluth, Minn., recently announced that construction is complete on the new Rock Ridge Career Academy High School in Virginia, Minn. According to a news release, the school measures in at 280,000 square feet and was designed by Cuningham Group Architecture and local firm DSGW Architects.

Amenities include an open main commons area; active learning studios and lab spaces; a CTE center; and labs for carpentry, metals, automotive work, culinary arts, and certified nursing assistant (CNA) skills. It also features a pool, gymnasium, and small- and large-scale collaboration spaces.

The school offers a wide variety of career tracks within three academies. According to the news release, the career tracks include “(1) Business Management, Administration, Arts, Communications and Information Systems; (2) Health and Human Services; and (3) Agriculture, Food, Manufacturing, Construction, Engineering and Science.” The news release reports that Rock Ridge Career Academy High School serves as the only wall-to-wall career academy school in the U.S. north of the Twin Cities area.

“Rock Ridge High School was built to be a world-class school. It was specifically designed for both direct instruction and project-based learning to flourish as teaching and learning tools in a career academy structure for all students,” said Rock Ridge Public Schools Superintendent Dr. Noel Schmidt. “It is no hyperbole to say that the community, teachers, and students can be proud of this extraordinary high school, which will be the envy of many districts throughout the State of Minnesota and United States. It is that unique.”

The school’s construction began in 2020, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Opportunity by Design Framework

    Opportunity by Design

    Educational improvement efforts often focus on curriculum, instruction, assessment, professional development, and intervention systems while treating the physical school building as background. But school design is not a passive backdrop to learning — it is a structural lever for equity.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.

  • Higher Ed is Betting on New Buildings While Quietly Undermining Their Campuses — Here’s Why

    In this climate, the owner’s representative has changed from a delivery-focused advisor to a strategic campus partner. Institutions are increasingly relying on owner’s reps not just to manage, cope, schedule, and budget, but also help evaluate whether a project should proceed at all.

  • Missouri Child Development Center Completes $2.3M Expansion

    The Urban Sprouts Child Development Center in St. Louis, Mo., recently announced the completion of a $2.3-million expansion and adaptive reuse project, according to a news release. The new space includes a retail café, outdoor learning space, and a support office building.