ASU Board of Trustees Approves $8M Nursing Building

The Arkansas State University System Board of Trustees recently approved the construction of a new nursing building at its Three Rivers campus in Malvern, Ark. The university received $8 million in federal funding for the project through the Fiscal Year 2023 year-end spending package pushed by U.S. Senator John Boozman, according to a university news release.

The new facility will measure between 22,000–25,000 square feet and feature four simulation labs with control rooms, an obstetrics room, a pediatric room, and two adult medical-surgical nursing spaces, the news release reports. It will also feature two 50-student computer labs and a 150-seat auditorium.

“We deeply appreciate Senator Boozman’s efforts to secure funding for ASU Three Rivers’ nursing program and for the construction of a facility to provide academic excellence for healthcare in Arkansas,” said ASU Three Rivers Chancellor Dr. Steve Rook.

The Arkansas State Board of Nursing (ASBN) recommended a larger facility to keep up with student enrollment during a site visit in 2019. The university’s current health science facility measures in at just 11,000 square feet.

“ASU Three Rivers has a longstanding tradition of preparing students to enter the workforce as professionals in the healthcare and health science fields,” said Vice Chancellor for Academic Affairs Pat Simms. “The College’s Practical Nursing program is one of the College’s oldest programs, producing more graduates than any other since the school’s inception.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Campus Safety Requires Using Every Resource Available

    Across the U.S., school and campus leaders are facing a security landscape that has changed dramatically over the past decade. Incidents on school property have increased in recent years, with several consecutive years setting record totals. According to analysis of data by CNN, dozens of shootings now occur on school grounds annually across K-12 and higher education environments.

  • Zurn Elkay Releases 2025 Sustainability Report

    Zurn Elkay Water Solutions recently announced the release of its annual sustainability report, according to a news release. The 2025 report discusses the organization’s efforts to maintain good environmental stewardship and the solutions provided in helping customers meet sustainability goals.

  • golden trophies with falling confetti

    Spaces4Learning Launches 2026 New Product Awards

    Spaces4Learning is happy to announce that we’re now accepting entries for the 2026 New Product Awards! The awards program recognizes the outstanding product development achievements of manufacturers and suppliers whose products or services are considered particularly noteworthy.

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.