Calif. High School Debuts New Competition-Sized Gym

San Rafael City Schools (SRCS) in San Rafael, Calif., recently celebrated the grand opening of a new competition-sized gymnasium at Terra Linda High School, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and BHM Construction for the 22,000-square-foot facility, which will play home to campus athletic events and whole-school assemblies and can serve as a community resource during emergencies.

The gym features amenities like weight and cardio conditioning spaces, team rooms, administrative space for student physical trainers and conferences, and a regulation-size court for basketball, volleyball, and other athletic competitions, the news release reports. The new space offers the capability to host league sporting events and to gather the entire school population for presentations or campus gatherings.

“This project successfully creates an improved new frontage environment for the TLHS campus, as well as for the neighborhood, with the addition of a new two-way bicycle pedestrian pathway and underground utilities,” said San Rafael City Schools Superintendent Jim Hogeboom. “In addition to providing comprehensive California Interscholastic Federation (CIF) regulation facilities to host athletic events, the new gymnasium will double as a much-anticipated community safety refuge in the event of emergency situations. With gratitude for the support that made Bond Measure B and this project possible, we hope to provide essential resources to our community at large.”

The space was designed to meet Collaborative for Higher Performance School (CHPS) guidelines to emphasize sustainability. These include the sustainable use of reclaimed water from dual piping for irrigation and sanitary facilities, daylight-responsive lighting, low-flow plumbing, high-efficiency HVAC powered by 60-percent renewable energy, and design-readiness for the potential future addition of solar power and a microgrid battery system, according to the press release.

“The strong partnerships forged between QKA, BHM, and the district resulted in an outstanding new facility which will enhance the TLHS campus and school community,” said QKA Principal Emeritus Steve Kwok. “Our expertise in high-performance education buildings allowed the design-build team to center the district’s priorities around making the building a safe and efficient campus landmark. Great emphasis was placed on the building’s environmental impact, including a permanent display on its sustainable features installed in the gymnasium lobby, which will serve as a learning tool for all entering the building.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Spaces4Learning Announces Winners of 2025 Product Awards

    Spaces4Learning has just announced the winners of the 2025 Product Awards! The award program recognizes innovation and excellence in products that enhance learning environments in K–12 schools and institutions of higher education.

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • California High School Starts Construction on STEAM, Music Buildings

    Tamalpais High School, part of the Tamalpais Union High School District, recently broke ground on two new major facilities for its campus in Mill Valley, Calif., according to a news release. The district is partnering with Quattrocchi Kwok Architects (QKA) and Lathrop Construction Associates for the Science Technology, Engineering, Arts, and Mathematics (STEAM) and Music Buildings, both replacing their outdated counterparts.

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

Digital Edition