Aurora University Completes Residence Hall for Neurodiverse Students

Aurora University in Aurora, Ill., recently completed construction on a new campus residence hall geared toward students on the autism spectrum, according to a news release. The five-story Don and Betty Tucker Hall includes space for 70 resident rooms and will also play home to the university’s Pathways program, which serves young adults on the spectrum. The university partnered with Cordogan, Clark & Associates for the building’s design and The Boldt Company for its construction.

The news release reports that the 35,109-square-foot residence hall is one of the first of its kind in the U.S. to be built from the ground up. According to retired university president Dr. Rebecca L. Sherrick, about 40 percent of young people on the autism spectrum are capable of attending college. “We also know that they have huge contributions to make in the workplace and society,” she said. “Those students need a safe and secure home environment on campus to fulfill their potential.”

Design elements specific to sensory-sensitive students include calm and muted color palettes; seamless drywall to minimize lines and distractions; adjustable light systems in all spaces; acoustic materials within walls to reduce sound; vinyl flooring to muffle footsteps; common areas with adjustable seating and quiet study areas; and a fitness center and study rooms on each floor.

The ground floor will also play home to the Betty Parke Tucker Center for Neurodiversity.

“I can see where this is a huge deal,” said Boldt Project Manager Ali Burke. “It’s really important for everybody to have an opportunity like this to learn and to have an environment for them to excel in.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Lewis C. Cassidy Elementary School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Lewis C. Cassidy Elementary School has been recognized with an EDS 2025 Grand Prize award in the category of New Construction.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

  • Allegion US Partners with Two Colleges for Mobile Credential Technology

    Allegion US recently announced a partnership with Florida Institute of Technology (FIT) and Denison College, in conjunction with Transact + CBORD, to install mobile credential technologies campus-wide, according to a news release. Implementing Mobile Student ID into Apple Wallet and Google Wallet will allow students access to campus facilities, amenities, and residence halls using just their phones.

  • ECM Technologies Wins ‘Most Innovative Business of the Year’ Award

    HVAC preventative maintenance and efficiency solutions provider ECM Technologies was recently named the “Most Innovative Business of the Year” at the 2025 Champions of Change Awards, according to a news release. The program recognizes Arizona business leaders and organizations taking steps to make a positive impact on the state through innovative thinking and philanthropy.

Digital Edition