Case Western Reserve University Selects Architect for New Science Building

Case Western Reserve University in Cleveland, Ohio, recently announced that it has selected a designer for a new construction project on campus, according to a news release. The university chose interdisciplinary design firm HGA to design its Interdisciplinary Science and Engineering Building (ISEB), which comes with a price tag of $300 million and is the university’s largest construction project in decades.

The building will stand in the Case Quad, which plays home to the university’s science and engineering buildings, and its northern side will serve as an entrance to the campus for the community at large. Design features include a windowed façade and landscaped entryway. The ultimate goal of the project is to create an environment that will attract researchers, stimulate economic growth, and foster collaboration and breakthroughs across different academic disciplines.

“A well-designed research building brings enough collaborative space that encourages interaction without undermining the space required for technical laboratories,” said Chris Martin, HGA principal and Science & Technology Market Sector Leader. “This new building has a distinct goal—to provide interdisciplinary teams a space that will allow them to join forces. Partnering with established and growing industries on research initiatives could lead to solutions for the world’s challenges.”

Local news reports that the new facility will be designed to create a “seamless transition from university to community.” It will provide research space for sciences including chemistry, biology, and physics, and engineering fields including biomedical, computer, and mechanical.

“We have some really terrifically talented researchers, but they are working in spaces that are 50, 60, or 70 years old, and just not conducive to the modern research that we need to be doing,” said Case Western Reserve University President Eric Kaler.

The news release reports that once complete, the ISEB will play home to research initiatives including the development of industrial-scale batteries for electrical grids; new green processes for sustainability in manufacturing; studying pathogens in HVAC systems; and developing new types of prosthetics, among others.

Construction is scheduled to begin in summer 2024 and finish in 2026.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Nonprofit Launches Center to Boost Data-Driven Student Success Strategies

    National nonprofit Complete College America (CCA) recently launched the Center for Leadership, Institutional Metrics, and Best Practices (CLIMB), according to a news release. CLIMB’s ultimate purpose is to help higher-education institutions use data-driven strategies to improve student outcomes by providing tools, frameworks, and support.

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Agualta STEAM Engine

    Outdoor Learning Spaces and Biophilic Design Create Community in East Los Angeles

    Griffith STEAM Magnet Middle School's Agualta STEAM Engine blends education, community, and nature through its adaptable design.

  • Florida Elementary School to Undergo $47M Reconstruction

    The School District of Osceola County in Kissimmee, Fla., recently announced a partnership with construction firm Skanska to reconstruct Reedy Creek Elementary School, according to a news release. The $47-million project will involve the new construction of a 96,000-square-foot academic center, renovating the remaining facilities, a full-site redevelopment, and demolishing portions of the existing school.

Digital Edition