New Educational Learning Designer Joins DLR Group

Design firm DLR Group recently announced that it has hired a new educational learning designer, according to a news release. Former teacher and K–12 administrator Dr. Tim Shimp will offer his experience from the trenches to help provide high-impact, innovative, and engaging learning environments out of the firm’s Chicago office. Shimp has served as an educator for more than 30 years, ten as a district superintendent, and has personal experience with almost every corner of the K–12 education system.

“Tim brings an educational experience that is invaluable,” said Dr. Marilyn Denison, DLR Group Principal. “His shared experience as an educator and administrator allows him to resonate with and serve our clients. He’s been in their shoes and now gets to sit on the other side, helping them through the process. He creates an environment that encourages professional learning opportunities and mind-stretching.”

The press release reports that Dr. Shimp has long been a proponent of future-ready learning spaces, both conducting his own research and presenting it at local and national conferences. His work has included facilitating and overseeing the master plans for educational facilities—both short- and long-term—to address a variety of specific issues facing districts and schools.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Spaces4Learning Announces 2026 Product Award Winners

    Spaces4Learning has just announced the winners of the 2026 Product Awards! The award program spotlights outstanding product development achievements of manufacturers and suppliers whose products or services are considered to be particularly noteworthy in their ability to enhance K–12 and higher-education learning environments.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Dallas-Area District Debuts Three New Facilities

    The Duncanville Independent School District in southwest Dallas, Texas, recently held ribbon-cutting ceremonies for three new facilities that resulted from a $170-million bond program passed in 2023, according to a news release.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.