Massachusetts Charter School Breaks Ground on New Academic Building

The Advanced Math and Science Academy Charter School in Marlborough, Mass., recently broke ground on a new 17,000-square-foot academic building, according to a news release. The facility will offer additional classroom and science lab space for the campus, which serves students in grades 6–12. The school partnered with Finegold Alexander Architects for the building’s design.

The public charter school currently owns and occupies a three-building space formerly used as an office park. The new academic facility has been designed to more closely support the school’s accelerated academic program. Phase one of the project includes both the new facility and a redesign of parking and circulation areas to improve pick-ups and drop-offs.


Rendering courtesy of Finegold Alexander Architects

“We are excited to embark on this significant partnership with AMSA to creatively address the design challenges that the school is currently facing,” said Finegold Alexander Principal and K–12 studio leader Regan Shields Ives.

According to a school news release, the new building will alleviate classroom space restrictions and feature state-of-the-art classroom technology and lab equipment. The project will also include grading for a future multipurpose events facility and gymnasium that will stand next to the academic building.

Funding for the project comes from a combination of school equity ($4 million), a tax-exempt bond ($24 million), and philanthropy ($2 million).

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition