California Junior High School Completes Conversion to Middle School

The Fremont Unified School District in Fremont, California, recently finished a multi-phase conversion to Thornton Middle School that will increase the school’s student population by almost 50 percent with the addition of sixth-grade students, according to a news release. The district partnered with Quattrocchi Kwok Architects and Blach Construction for the project that totaled 45,000 square feet of new construction and 57,000 square feet of renovation and modernization.

The campus conversion includes a new, two-story administration building featuring student support services and a library; five new two-story classroom buildings that were completed in 2022; and upgrades to all existing classroom buildings, multipurpose buildings, and locker rooms.

“The modern and flexible educational and support spaces that now make up Thornton Middle School provide each grade level with inspiring facilities to learn and grow,” said QKA Principal John Dybczak. “This has been a complex and fulfilling project to see through to the finish line, and the outcome is a testament to the teamwork of all parties involved.”

Sustainability features include solar-readiness, metal roofing panels, energy-efficient windows, high-efficiency mechanical systems and water-efficient plumbing systems, eco-friendly interior systems, and LED lighting. Renovations also saw the introduction of bio-swales for stormwater management and drought-tolerant landscaping.

“With every aspect of the campus affected by the multiple phases of construction, advance planning and coordination were invaluable to project success,” said Blach Project Executive Brad Fannin. “From the prefabrication of wall panels to the sequencing of work, we employed solutions from the outset that would maintain functionality and safety for Thornton’s students and staff.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • K–12 Safety Trends Report Reveals Reliance on Training, Technology

    Wearable safety technology provider CENTEGIX recently released its 2025 School Safety Trends Report, according to a news release. The report is based on more than 265,000 incidents during the 2024–25 school year as reported through the CENTEGIX Safety Platform, used by more than 800 school districts across the U.S.

  • Kraus-Anderson Continues Work in Minnesota School District

    Maple River Schools in Mapleton, Minn., recently began construction on another project included in a district long-range facilities plan. Construction management firm Kraus-Anderson recently began work on two new classrooms and an outdoor track and field facility, according to a news release.

  • Designing Learning Spaces that Support Student Mental Health and Wellness

    In today’s education landscape, schools are more than just centers for learning; they are integral to the holistic development and well-being of students. The global pandemic underscored the importance of addressing mental health in schools, as productivity dropped, stress levels rose and students faced challenges managing emotions.

  • KI Wall Demonstrates New Solutions at NeoCon 2025

    KI Wall attended NeoCon 2025 in Chicago, Ill., last month to showcase its new architectural wall systems and collaborations, according to a news release. Its customizable, design-forward wall solutions are intended to support creativity in work, education, and healthcare environments.

Digital Edition