APM Steam Provides Heat Exchanger Assessment, Testing Services for Higher Education Facilities

APM Steam recently released a press release emphasizing its Heat Exchanger Assessment and Testing Services for the maintenance of steam systems at colleges and universities. The comprehensive exam is intended to enhance energy efficiency, operational integrity, and safety in facility steam systems. The exam offers services like confirming operational effectiveness, assessing structural integrity via pressure testing, estimating costs for actions and repairs, evaluating potential energy savings, and providing a detailed report.

The services include documenting heat exchangers, including tag numbers, types, models and manufacturers, locations, and applications; identifying and verifying isolation valves and ports for cleaning; pressure testing to verify bundle integrity; providing a comprehensively detailed final report; quotes for heat exchangers that need cleaning or repair; and energy savings calculations, the news release reports.

Heat exchangers help transfer energy between different sources of liquid or steam. Certain components are susceptible to scale build-up from hard or untreated water, which leads to energy loss, longer heating times, and leaking tubes. Undetected leaks can also lead to issues like failure of traps or valves or fluctuations in pressure and temperature.

The service is available to large facilities including colleges and universities. More information is available on the APM Steam website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

  • Texas District Breaks Ground on New Elementary School

    The Splendora Independent School District (SISD) in Splendora, Texas, recently broke ground on a replacement facility for Greenleaf Elementary School, according to a news release. The district partnered with planning, engineering and program management firm Lockwood, Andrews & Newnam, Inc. (LAN) for the project.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

Digital Edition