APM Steam Provides Heat Exchanger Assessment, Testing Services for Higher Education Facilities

APM Steam recently released a press release emphasizing its Heat Exchanger Assessment and Testing Services for the maintenance of steam systems at colleges and universities. The comprehensive exam is intended to enhance energy efficiency, operational integrity, and safety in facility steam systems. The exam offers services like confirming operational effectiveness, assessing structural integrity via pressure testing, estimating costs for actions and repairs, evaluating potential energy savings, and providing a detailed report.

The services include documenting heat exchangers, including tag numbers, types, models and manufacturers, locations, and applications; identifying and verifying isolation valves and ports for cleaning; pressure testing to verify bundle integrity; providing a comprehensively detailed final report; quotes for heat exchangers that need cleaning or repair; and energy savings calculations, the news release reports.

Heat exchangers help transfer energy between different sources of liquid or steam. Certain components are susceptible to scale build-up from hard or untreated water, which leads to energy loss, longer heating times, and leaking tubes. Undetected leaks can also lead to issues like failure of traps or valves or fluctuations in pressure and temperature.

The service is available to large facilities including colleges and universities. More information is available on the APM Steam website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Planning with Clarity: Using AI to Make Better Campus Decisions, Not Just Better Designs

    Higher education leaders are being asked to make increasingly high-stakes decisions about campus facilities amid greater uncertainty than ever before. Social and economic pressures, shifting enrollment, and evolving learning models compete with growing deferred maintenance needs to strain even the most robust infrastructure budgets.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Dallas-Area District Debuts Three New Facilities

    The Duncanville Independent School District in southwest Dallas, Texas, recently held ribbon-cutting ceremonies for three new facilities that resulted from a $170-million bond program passed in 2023, according to a news release.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.