APM Steam Provides Heat Exchanger Assessment, Testing Services for Higher Education Facilities

APM Steam recently released a press release emphasizing its Heat Exchanger Assessment and Testing Services for the maintenance of steam systems at colleges and universities. The comprehensive exam is intended to enhance energy efficiency, operational integrity, and safety in facility steam systems. The exam offers services like confirming operational effectiveness, assessing structural integrity via pressure testing, estimating costs for actions and repairs, evaluating potential energy savings, and providing a detailed report.

The services include documenting heat exchangers, including tag numbers, types, models and manufacturers, locations, and applications; identifying and verifying isolation valves and ports for cleaning; pressure testing to verify bundle integrity; providing a comprehensively detailed final report; quotes for heat exchangers that need cleaning or repair; and energy savings calculations, the news release reports.

Heat exchangers help transfer energy between different sources of liquid or steam. Certain components are susceptible to scale build-up from hard or untreated water, which leads to energy loss, longer heating times, and leaking tubes. Undetected leaks can also lead to issues like failure of traps or valves or fluctuations in pressure and temperature.

The service is available to large facilities including colleges and universities. More information is available on the APM Steam website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • T&T Construction Management Group Completes Pasco High School Expansion

    Pasco High School in Dade City, Fla., recently announced that it has completed an expansion project in partnership with T&T Construction Management Group, Inc., Harvard Jolly Architecture, and Williams Company.

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).