University of Tennessee Expands WiFi Access to 102,000-Seat Stadium

The University of Tennessee in Knoxville, Tenn., recently deployed a new network offering blanket WiFi 6E access to all 101,195 seats in its historic Neyland Stadium, according to a news release. The project’s goal is to provide unlimited content streaming and other modern mobile services to fans during the entire game-day experience. It will also allow for the smooth operation of other stadium services like mobile ticketing, physical security, point-of-sale systems, and communication. The university partnered with HPE Aruba Networking.

“Exceptional game day and special event experiences play an important part in fulfilling our mission to lead the way forward in all aspects of college sports,” said Thomas Moats, Jr., the University of Tennessee Athletics’ assistant athletic director for Information Technology. “Adopting wireless connectivity, including Wi-Fi 6E, from HPE Aruba Networking enables us to achieve our connected stadium goals for supplying next-generation mobile experiences that contribute to an exceptional fan experience.”

Moats also said that applications range from touchless gate entry to monitoring other sporting events to providing children’s entertainment to social media access. It has also improved wait times at all of the stadium’s 26 gates.

The AI-powered management solutions YPE Aruba Networking User Experience Insight (UXI) and HPE Aruba Networking Central on Premises will provide both real-time network health and performance monitoring as well as network optimization and security, respectively.

“With HPE Aruba Networking Central we gain an intuitive management solution that helps us rapidly troubleshoot our network and provides real-time insights for optimizing Wi-Fi performance during fast-moving events,” said Moats. “In addition to supporting a wide range of currently-connected solutions, we’ll be able to roll out many new IoT solutions, such as restroom and lighting management systems for further improved attendee experiences and operational sustainability.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California District Debuts New High-School CTE Center

    The West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently held a ribbon-cutting ceremony for the new CTE Center at Analy High School, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) for the facility’s design and GCCI for its construction, and funding came from local Measure A bond funds.

  • Wenger Names New Vice President of Sales for Performing Arts, Controls

    Wenger Corporation, which provides products and solutions for music and theater education, performing arts and athletic storage, recently announced the hiring of a new Vice President of Sales for Performing Arts and Controls.

  • California District Opens New Robotics Center

    The Fremont Union High School District (FUHSD) in Cupertino, Calif., recently held a Grand Opening ceremony for a new, district-wide Robotics Center, according to a news release. The 14,500-square-foot facility was designed by Quattrocchi Kwok Architects (QKA); Landmark Constructors served as the builder and Blach Construction as general construction manager.

  • Texas A&M Opens First Building at Fort Worth Campus, Breaks Ground on Research Facility

    The Texas A&M University System marked a major milestone in the development of its Fort Worth campus by opening its first completed academic building and breaking ground on a second facility designed to expand research and industry collaboration.