California Private High School Completes New Community Performing Arts Center

Sonoma Academy—a private, co-ed college preparatory school in Santa Rosa, Calif.—recently announced that construction is complete on a new, 350-seat Community Performing Arts Center, according to a news release. The facility will play home to the school’s music, theater, and film productions and host various types of programming for the community at large. The school partnered with Quattrocchi Kwok Architects (QKA) and WRNS Studio for the project’s design, DPR Construction for construction, and The Shalleck Collaborative as a theatrical consultant.

“The opening of the Community Performing Arts Center marks the start of a new era for our school,” said Tucker Foehl, Head of School at the Sonoma Academy. “This beautiful, state-of-the-art facility will provide a gathering place for our school community and a home for our stellar theater, music and dance programs. The high-tech features and thoughtfully designed spaces will allow us to stage more ambitious productions and involve more student performers than ever before. Equally exciting is the opportunity we have to welcome the surrounding community to our campus, as we expand our roster of events and develop partnerships with other local organizations.”

The facility measures in at 27,500 square feet and includes amenities like a 350-seat theater, stage, full orchestra pit, and supporting spaces. The AV system uses a Dolby Laboratories sound system and a Christie Digital 4K laser projector. Other amenities include an Actors Studio with a classroom and rehearsal space, a scene ship for backdrops and stage scenery, dressing rooms, additional classroom and storage space, and a lobby and box office, according to the news release. Sustainability features include energy-efficient lighting and HVAC systems, as well as a displacement heating and cooling system for audience seating.

“It has been a remarkable experience to work alongside Sonoma Academy and the collaborative project team to design this truly remarkable and cutting-edge performing arts building,” said Steve Kwok, QKA Principal Emeritus. “The various spaces will allow students to participate in the complete production of a performance, and it will certainly be an invaluable community asset.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.

  • Washington State University Debuts New Engineering Hall

    Washington State University recently celebrated a dedication ceremony for the new Schweitzer Engineering Hall on its Pullman campus in Pullman, Wash., according to university news. The facility measures 66,288 square feet, and its completion marks the first milestone in a larger university effort to modernize the engineering and design district.

  • Phoenix High School Completes First Phase of Campus Renovations

    Metro Tech High School, part of the Phoenix Union High School District (PXU) in Phoenix, Ariz., recently announced the completion of the first stage of a campus renovation project, according to a news release. The school reopened a series of public-facing business operations spaces including credit union, daycare, floral, cosmetology, and culinary services. It also includes new CTE learning spaces for the school’s nursing assistant, pharmacy, and sports medicine programs.

  • Houston-Area High School Receives Best Project Award from ENR

    Tomball West High School near Houston, Texas, recently received a K–12 Education Best Project Award in Engineering News-Record’s 2026 Texas & Southeast Best Projects Awards, according to a press release. The new facility was completed in May and opened its doors to students for the fall 2026 semester.