Cyber Acoustics Launches Headset for K–12 Classrooms

Edtech manufacturer Cyber Acoustics recently announced the launch of the AC-6014 USB-C Headset, designed for use in K–12 and virtual classrooms, according to a news release. The announcement comes on the heels of three recent USB-C products including two headsets with a microphone and one without.

“As schools across the country head back to school, we are seeing an increase in requests for USB-C offerings as more schools adopt newer iPad and Chromebook models,” said Cyber Acoustics COO Steve Erickson. “The AC-6000 series is one of our best-selling lines of classroom headsets, as it works great for kids of all ages, and the new AC-6014 enables us to meet the evolving needs of our customers. We also took this opportunity to redesign the USB connection on all of our USB-A and USB-C models to offer improved durability at this very common stress point, to give teachers one less thing to think about when they are trying to instruct.”

The AC-6014 offers durability features like a headband that can be bent or twisted, a tangle-resistant braided TuffCord that can be “coiled, flexed, or even chewed without sacrificing performance.” The product launches in October.

Cyber Acoustics also partners with schools and educational institutions to offer a no-cost headset recycling program to properly re-use elements of wired or wireless headsets of any brand.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • A digital silhouette works at a computer, immersed in a glowing, interconnected world

    How Will AI Transform Learning Space Design?

    For years, higher education has designed learning spaces around technology as a tool for display, capture, collaboration, and connectivity. AI changes that equation.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • New City School

    Turning Crisis into Opportunity: Transforming New City School

    When New City School in St. Louis suffered catastrophic flood damage in July 2022, the event could have marked a serious setback for the 100-year-old institution. Instead, it became a forward-looking opportunity.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.