IMETCO Releases IntelliWrap PR Roofing Underlayment

IMETCO recently announced the release of the IntelliWrap PR self-adhering roofing underlayment, which provides a water- and air-tight, vapor-permeable seal for roofing systems. The product was designed for steep slopes (2:12 or more) of standing seam metal, clay tile, slate tile, cedar shingle roofs, and more. The vapor permeability allows building materials to dry more quickly, reducing the odds of moisture infiltration and damage, according to a news release.

The IntelliWrap PR underlayment can withstand temperatures of up to 250°F and meets ASTM E2178 air-barrier resistance. It’s compatible with substrates including fiberglass-reinforced gypsum sheathing board, rigid insulation, plywood, steel, aluminum, galvanized metal, and OSB, the news release reports.

 “With its slip-resistant, UV-stable surface, the new IntelliWrap underlayment facilitates safe installation while offering a vapor-permeable barrier that allows the roof assembly to breathe,” said Jonnie Hasan, P.E., IMETCO director of engineering and sales support. “It bonds fully without the use of primers and is simple to install with no special tool requirements.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.

  • iPark 87

    Building a Future-Focused Career and Technical Education Center

    A district superintendent shares his team's journey to aligning student passions with workforce demands, and why their new CTE center could be a model for districts nationwide.

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.

Digital Edition