Colorado State University Starts Construction on Liberal Arts Building Renovation

Colorado State University in Fort Collins, Colo., recently began construction on a $137-million renovation project to one of its largest academic buildings, according to local news.
Last week, one of the three wings of Clark Hall (“Clark B”) was demolished to clear the way for a ground-up replacement. Once work on Clark B is complete, a second wing (“Clark A”) will undergo major renovations, according to CBS News. No renovation work is currently scheduled for the third wing, “Clark C.”

“The complex will serve nearly every undergraduate student on campus at some point in their academic career at CSU,” said Ryan Claycomb, College of Liberal Arts project lead and associate dean for faculty affairs, in a local news article. “When the project is complete, we truly expect this building complex to be the heart and hub of much of the academic activity on campus.”

The university estimates that 97% of undergraduate students who attend the Fort Collins campus will have at least one class in the Clark building during a four-year academic career. “The Clark building hosts more students than any other building on campus,” said Greg Luft, CSU journalism professor and graduate.

Construction on Clark B is scheduled to begin in November 2024, providing an additional 90,000 square feet of academic and office space. The university was recently granted state funding to put the project into motion. The exterior of Clark A will be renovated to match the B wing. The move is triggered by the building’s age, with “clear evidence of parts of the staircases and façade literally falling apart,” CBS News reports.

The project is scheduled for completion by May 2026, according to the university website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

  • Austin International School Library Renovation

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Austin International School has been recognized with an EDS 2025 Grand Prize award in the category of Renovation.

  • Beeville ISD Starts Construction on New Elementary School

    The Beeville Independent School District near Corpus Christi, Texas, recently began a construction project that will consolidate two existing, aging schools into a new elementary school, according to a news release. The district is partnering with Pfluger Architects and Spawglass General Contractors for the design and construction, respectively, of the new facility.

  • Singlewire Software Report Reveals Gaps in K–12 School Entrance Security

    Single Software recently released its first-ever School Entrance Security Report based on more than 500 responses from U.S. school staff members. According to a news release, the findings highlight a gap between K–12 leaders’ wishes for school safety and how safe the schools actually are, as well as the challenges facing students and staff in that goal.

Digital Edition