Los Angeles Unified School District Adopts VR Learning Platform

The Los Angeles Unified School District (LAUSD) recently announced its partnership with Avantis Education to bring educational virtual and augmented reality (VR/AR) solution ClassVR to its students. A news release reports that the district has already deployed more than 16,000 ClassVR headsets as part of the Los Angeles Unified Instructional Technology Initiative. ClassVR includes the hardware, software, training, and support necessary to deploy the solution in schools—including access to the Eduverse library, home to hundreds of thousands of educational VR/AR resources.

“Los Angeles Unified has demonstrated its commitment to being a pioneer in educational technology by placing students at the forefront of innovative learning tools,” said Avantis Education CEO Huw Williams. “Through our collaboration, we’re proud to help the district expand its use of VR technology in a thoughtful, strategic way, supporting the district’s vision of making learning more engaging and future-focused.”

LAUSD and Avantis have partnered for two years to bring VR solutions to the district, according to the news release. ClassVR was initially adopted in a handful of schools and spread from there. The new collaboration brings these VR solutions to before- and after-school enrichment programs, using immersive learning to boost academic outcomes. Resources cover topics from science to history to English to career and technical education, with broad applications in a wide variety of fields and disciplines.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Houston-Area High School Receives Best Project Award from ENR

    Tomball West High School near Houston, Texas, recently received a K–12 Education Best Project Award in Engineering News-Record’s 2026 Texas & Southeast Best Projects Awards, according to a press release. The new facility was completed in May and opened its doors to students for the fall 2026 semester.

  • Construction Begins on 100+ Acre K–12 Campus Designed for Lakota Culture

    The Cheyenne River Sioux Tribe (CRST) and the Cheyenne-Eagle Butte School District in Eagle Butte, S.D., recently broke ground on a new K–12 campus that will cover more than 100 acres and serve students and families across 1,600 square miles, according to a news release.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • University of Washington Opens New Broadcast Studio

    The University of Washington in Seattle, Wash., recently announced the opening of Sundodger Studios, a new broadcast, production, and content facility, according to a news release. The university partnered with Anthony James Partners for the design and development of the studio, which will host about 100 live broadcasts and 120 live videoboard shows per year.