Greenheck Debuts New Energy Recovery Ventilator

Greenheck recently released a new energy recovery ventilator, the ERVi, designed for small indoor spaces like basements and mechanical rooms, according to a news release. The hardware can fit through a 30-inch door and be mounted on the ceiling for retrofit and decarbonization projects. The unit provides both right-hand and left-hand access, as well as the ability to discharge at either end.

The unit comes in two models. “The ERVi-10 discharges 375–1,500 cfm with a maximum height of 18 inches, while the ERVi-20 discharges 750–2,500 cfm with a maximum height of 23 inches,” the news release reports.

Among the ERVi’s optional features are factory-installed, low-leakage dampers; MERV-13 filters, frost and economizer controls, and downstream heating and cooling controls. Every unit contains a 3-inch polymer enthalpy wheel, electric motor, factory controls with a DDC microprocessor, and a direct drive fan.

More information is available on the Greenheck website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Montclair State University Debuts New VR Facility

    Montclair State University in Montclair, N.J., recently announced the completion of a new virtual reality learning facility developed in partnership with Dreamscape Learn, according to a news release. The 2,450-square-foot lab space is inside the College of Communication and Media building and will serve students pursuing careers in digital media, virtual reality, and content creation.

  • University of Idaho Debuts New Campus Housing Community

    The University of Idaho in Moscow, Idaho, recently held a ribbon-cutting ceremony for Vandal Village, a new campus housing community for graduate students and families, according to a news release.

  • California District Opens New Continuation High School

    The Fort Bragg Unified School District (FBUSD) in Fort Bragg, Calif., recently held a ribbon-cutting ceremony for Noyo High School, a continuation high school that provides alternative education options for students in grades 6–12, according to a news release. The district partnered with Quattrochi Kwok Architects for design and FRC Inc. for construction, and the project’s funding came from Local Bond Measure B.