Oregon Institute of Technology to Construct $35M Mass Timber Residence Hall

Oregon Institute of Technology in Klamath Falls, Ore., recently announced the construction of a new, $35-million mass timber residence hall, according to college news. The facility will stand four stories, have room for 517 students, and cover 86,710 square feet to address the college’s need for more on-campus housing. Construction has an estimated completion date of December 2025.

The facility was designed to showcase its mass timber construction, a deliberate move toward reducing the building’s carbon footprint. The goal is to create a warm, high-quality, long-lasting space for students to relax and collaborate. Students participated in the steering committee that guided the new space’s aesthetic.

“This new residence hall demonstrates how Oregon Tech continues to lead in sustainability and innovation while addressing the needs of our growing student community,” said Dr. Nagi Naganathan, Oregon Tech President. “With support from the Oregon Legislature and the Office of the Governor, Oregon Tech is constructing one of the first residence halls in Oregon to utilize mass timber floors and roofs with panelized wood frame walls, and it will serve as a landmark example of carbon-efficient construction in higher education.”

The college is partnering with Bogatay Construction, Inc., also based in Klamath Falls, for the project’s construction. The news release reports that 89% of the project’s work is coming from firms within a 100-mile radius of campus.

“Using prefabricated CLT panels reduces labor, material waste, and the building’s carbon footprint, all while creating a high-quality, safe living environment for students,” said Matt Bogatay, Bogatay Construction President.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Texas District Breaks Ground on Second High School

    The Waller Independent School District in Waller, Texas, recently held a groundbreaking ceremony for what will become its second high school, according to a news release.

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.