Washington University School of Medicine Completes $165M Expansion Project

The Washington University School of Medicine in St. Louis, Mo., recently completed a vertical expansion of its Steven & Susan Lipstein BJC Institute of Health (BJCIH), according to a news release. The university partnered with Lawrence Group for the design of the six-floor addition, which cost about $165 million.

The project adds 160,000 square feet of lab and research space to the building’s north tower. Amenities will include a 7,400-square-foot Biologic Therapy Core Facility (BTCF), which will manufacture cellular therapies for cancer treatment; 100,000 square feet of lab space expansion; and about 43,000 square feet of mechanical building-support space. The project also includes a new elevator shaft in the building’s northwest corner, the news release reports.

“Lawrence Group’s design team collaborated closely with the owner’s critical facilities engineers to develop design criteria, testing requirements, and construction details for the project and to ensure compliance with industry standards in the design,” said Ryan King, Lawrence Group Principal and Healthcare Market Leader. “The Lawrence Group team used its bank of healthcare expertise and creativity to design this unique solution for the university.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Opportunity by Design Framework

    Opportunity by Design

    Educational improvement efforts often focus on curriculum, instruction, assessment, professional development, and intervention systems while treating the physical school building as background. But school design is not a passive backdrop to learning — it is a structural lever for equity.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Chicago District Completes Construction on New Elementary School

    North Chicago School District 187 in North Chicago, Ill., recently held a ribbon-cutting ceremony for the new Forrestal Elementary School, according to a news release. The new school marks a major investment in military-connected students and families at Naval Station Great Lakes.

  • How Proactive Maintenance Can Transform Athletic Facilities into Strategic Assets for College Sports

    College athletics is entering one of the most transformative periods in its history. With NIL reshaping financial models and competitive expectations, athletic departments across the country are being asked to do more than ever with increasingly constrained resources.