Washington University School of Medicine Completes $165M Expansion Project

The Washington University School of Medicine in St. Louis, Mo., recently completed a vertical expansion of its Steven & Susan Lipstein BJC Institute of Health (BJCIH), according to a news release. The university partnered with Lawrence Group for the design of the six-floor addition, which cost about $165 million.

The project adds 160,000 square feet of lab and research space to the building’s north tower. Amenities will include a 7,400-square-foot Biologic Therapy Core Facility (BTCF), which will manufacture cellular therapies for cancer treatment; 100,000 square feet of lab space expansion; and about 43,000 square feet of mechanical building-support space. The project also includes a new elevator shaft in the building’s northwest corner, the news release reports.

“Lawrence Group’s design team collaborated closely with the owner’s critical facilities engineers to develop design criteria, testing requirements, and construction details for the project and to ensure compliance with industry standards in the design,” said Ryan King, Lawrence Group Principal and Healthcare Market Leader. “The Lawrence Group team used its bank of healthcare expertise and creativity to design this unique solution for the university.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Baton Rouge Center for Visual and Performing Arts

    Baton Rouge Center for Visual and Performing Arts

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Baton Rouge Center for Visual and Performing Arts has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Western Kentucky University, Gilbane Announce “Elevate WKU” Partnership

    Western Kentucky University in Bowling Green, Ky., recently announced that it has reached the financial close on a on a public-private partnership (P3) with Gilbane Development, according to a news release.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.

  • California High School Opens New Classroom Building for 7th-, 8th-Graders

    Santa Rosa City Schools in Santa Rosa, Calif., recently announced the completion of a new classroom building for Piner High School. As the campus transitions to a Junior/Senior High School, the facility will play home to the school’s new population of seventh- and eighth-grade students.