California High School Starts Construction on New CTE Building

Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking. The district partnered with Quattrocchi Kwok Architects (QKA) for the project’s design and GCCI for construction.

Amenities will include a fabrication studio with built-in welding equipment; dedicated classrooms for innovative technology, science, agriculture, and culinary skills; collaboration rooms and prep rooms; three flex classrooms; utility spaces; and storage, according to the news release.

“This new facility represents a significant investment in our students’ futures,” said WSCUHSD Superintendent Chris Meredith. “These modern, well-equipped spaces will allow students to explore their passions and develop the specialty skills needed for success. Thank you to the community for its continuous support in making this project a reality, and our dedicated project team for guiding us through this process.”

Work also includes improvements to the adjacent site, as well as paving and landscaping to merge the new facility into a single cohesive campus environment. The project will cost an estimated $27 million, with funding coming through local Measure A bond funds, the news release reports.

“We are proud to partner with the West Sonoma County Union High School District on this transformative project,” said Kevin Chapin, QKA Principal. “We aim to foster innovation through design and these spaces will facilitate the expansion of important career-readiness programming on campus.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • UCF Modernizes College of Hospitality Management

    The University of Central Florida in Orlando, Fla., recently completed a major renovation effort for the Rosen College of Hospitality Management, according to a news release. The project modernized 77,600 square feet worth of academic classrooms, teaching labs, and collaborative spaces to support both students and faculty.

  • GeoCam and UCLA: Modernizing Campus Accessibility Mapping

    In early 2025, UCLA partnered with GeoCam to capture and modernize its pedestrian infrastructure data. The goal was ambitious but clear: to produce a high-accuracy, imagery-backed digital map of every sidewalk, pathway, ramp, and ADA-related feature on UCLA’s 419-acre campus.

  • California Middle School Breaks Ground on Major Renovation Project

    The Hillsborough City School District (HCSD) in Hillsborough, Calif., recently began construction on new multipurpose and administration facilities for Crocker Middle School, according to a news release.