California High School Starts Construction on New CTE Building

Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking. The district partnered with Quattrocchi Kwok Architects (QKA) for the project’s design and GCCI for construction.

Amenities will include a fabrication studio with built-in welding equipment; dedicated classrooms for innovative technology, science, agriculture, and culinary skills; collaboration rooms and prep rooms; three flex classrooms; utility spaces; and storage, according to the news release.

“This new facility represents a significant investment in our students’ futures,” said WSCUHSD Superintendent Chris Meredith. “These modern, well-equipped spaces will allow students to explore their passions and develop the specialty skills needed for success. Thank you to the community for its continuous support in making this project a reality, and our dedicated project team for guiding us through this process.”

Work also includes improvements to the adjacent site, as well as paving and landscaping to merge the new facility into a single cohesive campus environment. The project will cost an estimated $27 million, with funding coming through local Measure A bond funds, the news release reports.

“We are proud to partner with the West Sonoma County Union High School District on this transformative project,” said Kevin Chapin, QKA Principal. “We aim to foster innovation through design and these spaces will facilitate the expansion of important career-readiness programming on campus.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • R.I. District Holds Ribbon-Cutting Ceremony for New Elementary School

    Cranston Public Schools in Cranston, R.I., recently announced the completion of Gladstone Elementary School, according to a news release. The 100,000-square-foot facility serves as a replacement for the 1950s-era former building, and it consolidates the student, faculty, and staff populations of Gladstone and Arlington Elementary Schools.

  • Missouri K–12 District Cuts Ribbons on Two New Middle Schools

    Springfield Public Schools in Springfield, Mo., recently celebrated the completion of two new middle school facilities with ribbon-cutting ceremonies, according to a district news release. The district officially opened the new Pipkin Middle School and Reed Academy on Sept. 3, both of which were funded through the $220-million Proposition S bond program approved by voters in 2023.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.