California High School Starts Construction on New CTE Building

Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking. The district partnered with Quattrocchi Kwok Architects (QKA) for the project’s design and GCCI for construction.

Amenities will include a fabrication studio with built-in welding equipment; dedicated classrooms for innovative technology, science, agriculture, and culinary skills; collaboration rooms and prep rooms; three flex classrooms; utility spaces; and storage, according to the news release.

“This new facility represents a significant investment in our students’ futures,” said WSCUHSD Superintendent Chris Meredith. “These modern, well-equipped spaces will allow students to explore their passions and develop the specialty skills needed for success. Thank you to the community for its continuous support in making this project a reality, and our dedicated project team for guiding us through this process.”

Work also includes improvements to the adjacent site, as well as paving and landscaping to merge the new facility into a single cohesive campus environment. The project will cost an estimated $27 million, with funding coming through local Measure A bond funds, the news release reports.

“We are proud to partner with the West Sonoma County Union High School District on this transformative project,” said Kevin Chapin, QKA Principal. “We aim to foster innovation through design and these spaces will facilitate the expansion of important career-readiness programming on campus.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Construction Begins on 100+ Acre K–12 Campus Designed for Lakota Culture

    The Cheyenne River Sioux Tribe (CRST) and the Cheyenne-Eagle Butte School District in Eagle Butte, S.D., recently broke ground on a new K–12 campus that will cover more than 100 acres and serve students and families across 1,600 square miles, according to a news release.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • ed tech conference calendar

    Upcoming Awards, Events & Webinars

  • Longwood University Hits Construction Milestone on New Music Education Facility

    Longwood University in Farmville, Va., recently celebrated the topping out of its new music education and performance facility, according to a news release. The university partnered with development and construction firm Skanska on the 63,800-square-foot facility, which began construction in August 2025 and has an estimated completion date of fall 2028.