University of Connecticut Upgrades Basketball Facility’s AV Systems

The University of Connecticut recently partnered with Metinteractive to upgrade the AV systems of the Gampel Pavilion basketball facility on its campus in Mansfield, Conn., according to a news release.

The work includes new LED videoboard displays; new seating for the geodesic dome structure’s inner bowl; upgrades to the existing broadcast system to boost live production capabilities; and future-planning by linking the Pavilion to the Riazza Performance Center’s control room as a secondary control room for athletic events.

University of Connecticut Gampel Pavilion
Photo courtesy of Metinteractive

According to the news release, “The control room was outfitted with two larger ElationLogic DV65 monitors, a Ross Ultrix router, Ross XPression motion graphics render engine, an Evertz DreamCatcher DC-ONE replay platform and a master clock for AV synchronization. Metinteractive installed fiber to connect the control room to two much larger Daktronics LED videoboards mounted at each short end of the court and integrated a Ferrofish Pulse16 MX AD/DA converter with the displays’ video content.”

Metinteractive has partnered with the university on a number of recent projects, including the UConn Freitas Volleyball, Toscano Hockey arena, the student rec center, the Athletic District Development, and exhibits on the UConn Hartford campus, according to the news release.

“UCONN is our home team – we’re big Huskies fans,” said Jeff Mele, Metinteractive’s Chief Commercial Officer and Project Executive for Gampel Pavilion.  “As taxpayers in the state, it’s also important to us to see that tax dollars and donor dollars are spent wisely. Gampel Pavilion is part of the continuing effort to standardize and connect facilities across all sports on the UCONN Storrs campus,” he explains.  “Facilities that are fragmented often require more support and more initial capital expenditures due to their individual, complete systems.  Although standardization and connectivity add complexity, the long-term results are lower costs and greater operational flexibility.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Clemson to Launch North America’s Largest College Campus Smart Parking Program

    Clemson University in Clemson, S.C., recently announced a partnership with smart parking and curbside management solutions provider eleven-x to launch a smart parking initiative for its population of 29,000 students and faculty, according to a news release.

  • Rush-Henrietta Central School District’s Sperry High School

    A New Perspective: Using Adaptive Reuse Concepts in K-12 Planning

    In the face of increasing pressures on construction timelines, budgets, and material availability, the renovation and reuse of pre-existing structures for new purposes can help bridge the gap between modern school programming and outdated school infrastructure.

  • Pangram Secures Funding for AI Detection Technology

    Pangram, which provides technology that detects AI-generated text, recently announced that it has secured nearly $4 million in pre-seed and seed funding, according to a news release. The most recent round of investments, totaling $2.7 million, come on top of the pre-existing seed fund of $1.25 million.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition