University of Connecticut Upgrades Basketball Facility’s AV Systems

The University of Connecticut recently partnered with Metinteractive to upgrade the AV systems of the Gampel Pavilion basketball facility on its campus in Mansfield, Conn., according to a news release.

The work includes new LED videoboard displays; new seating for the geodesic dome structure’s inner bowl; upgrades to the existing broadcast system to boost live production capabilities; and future-planning by linking the Pavilion to the Riazza Performance Center’s control room as a secondary control room for athletic events.

University of Connecticut Gampel Pavilion
Photo courtesy of Metinteractive

According to the news release, “The control room was outfitted with two larger ElationLogic DV65 monitors, a Ross Ultrix router, Ross XPression motion graphics render engine, an Evertz DreamCatcher DC-ONE replay platform and a master clock for AV synchronization. Metinteractive installed fiber to connect the control room to two much larger Daktronics LED videoboards mounted at each short end of the court and integrated a Ferrofish Pulse16 MX AD/DA converter with the displays’ video content.”

Metinteractive has partnered with the university on a number of recent projects, including the UConn Freitas Volleyball, Toscano Hockey arena, the student rec center, the Athletic District Development, and exhibits on the UConn Hartford campus, according to the news release.

“UCONN is our home team – we’re big Huskies fans,” said Jeff Mele, Metinteractive’s Chief Commercial Officer and Project Executive for Gampel Pavilion.  “As taxpayers in the state, it’s also important to us to see that tax dollars and donor dollars are spent wisely. Gampel Pavilion is part of the continuing effort to standardize and connect facilities across all sports on the UCONN Storrs campus,” he explains.  “Facilities that are fragmented often require more support and more initial capital expenditures due to their individual, complete systems.  Although standardization and connectivity add complexity, the long-term results are lower costs and greater operational flexibility.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • North Texas School District Completes Third New Elementary School

    The Denton Independent School District in Dallas, Texas, recently finished construction on its third prototype design elementary school, Reeves Elementary, according to a news release.

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

Digital Edition