MiraCosta College Completes $42.5M Chemistry, Biotechnology Building

MiraCosta College in Oceanside, Calif., recently finished construction on a new, $42.5-million Chemistry and Biotechnology Building, according to a news release. The university partnered with builder C.W. Driver Companies and HED Architects on the 20,630-square-foot facility, which will serve the school’s expanding STEM programs.

The new facility includes shaded outdoor gathering spaces that connect to the larger STEM quad, as well as covered porches and screened study spaces to encourage outdoor collaboration. The interior uses high-efficiency fixtures, eco-friendly materials, and sustainable finishes that integrate with the surrounding campus. The building was designed to meet LEED Silver certification standards, according to the news release.

“This is a significant milestone for MiraCosta College as we officially open the doors to the new Chemistry and Biotechnology Building,” said MiraCosta College Project Manager Joe Webber. “The world is facing challenges that will require innovative solutions, and STEM education will play a vital role in shaping the future. This facility provides our students and faculty with the tools, technology, and resources they need to explore, innovate, and make meaningful contributions to these fields.”

Amenities include modern instructional and lab spaces designed to meet industry needs and provide students with practical skills.

“We are proud to have collaborated with MiraCosta College on delivering this transformative facility,” said Andy Feth, C.W. Driver project executive. “Designed with sustainability, innovation, and student success in mind, this building represents our ongoing commitment to creating high-quality, future-ready educational spaces.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

  • Texas District Breaks Ground on New Elementary School

    The Splendora Independent School District (SISD) in Splendora, Texas, recently broke ground on a replacement facility for Greenleaf Elementary School, according to a news release. The district partnered with planning, engineering and program management firm Lockwood, Andrews & Newnam, Inc. (LAN) for the project.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

  • Rice University to Build New Student Life Complex

    Rice University in Houston, Texas, recently announced that a groundbreaking ceremony for the upcoming Moody Center Complex for Student Life (MCCSL) will take place on May 8, 2025, according to a university news release. The 75,000-square-foot facility was designed by architecture firm Olson Kundig with Page serving as executive architect, and it has an estimated completion date of fall 2027.

Digital Edition