MiraCosta College Completes $42.5M Chemistry, Biotechnology Building

MiraCosta College in Oceanside, Calif., recently finished construction on a new, $42.5-million Chemistry and Biotechnology Building, according to a news release. The university partnered with builder C.W. Driver Companies and HED Architects on the 20,630-square-foot facility, which will serve the school’s expanding STEM programs.

The new facility includes shaded outdoor gathering spaces that connect to the larger STEM quad, as well as covered porches and screened study spaces to encourage outdoor collaboration. The interior uses high-efficiency fixtures, eco-friendly materials, and sustainable finishes that integrate with the surrounding campus. The building was designed to meet LEED Silver certification standards, according to the news release.

“This is a significant milestone for MiraCosta College as we officially open the doors to the new Chemistry and Biotechnology Building,” said MiraCosta College Project Manager Joe Webber. “The world is facing challenges that will require innovative solutions, and STEM education will play a vital role in shaping the future. This facility provides our students and faculty with the tools, technology, and resources they need to explore, innovate, and make meaningful contributions to these fields.”

Amenities include modern instructional and lab spaces designed to meet industry needs and provide students with practical skills.

“We are proud to have collaborated with MiraCosta College on delivering this transformative facility,” said Andy Feth, C.W. Driver project executive. “Designed with sustainability, innovation, and student success in mind, this building represents our ongoing commitment to creating high-quality, future-ready educational spaces.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

Digital Edition