Zurn Releases New Ductile Iron Frame Trench Drain System

Zurn Elkay Water Solutions recently released the newest addition to its Train Drench portfolio, the Ductile Iron Frame Trench Drain System, according to a news release. The product is designed for heavy-duty applications like airports, military, universities, and more.

The lightweight, durable iron frame adds DIN F loading capacity and incorporates a center bolt lockdown to meet DIN F load requirements, as well. The 6” system includes the standard, radiused bottom of the Z886 Perma-Trench Drain channels, which reduces the buildup of sediment and increases rate of flow. Zurn also offers trench channels with black additives for UV protection.

“This new system leverages the benefits of Zurn’s market leading 6” trench channel system,” said Nick Heschke, Siteworks Product Manager at Zurn Elkay. “We’ve expanded on our standard trench drain systems to provide even more durability and strength. We’re helping our customers to reduce the installation time required for DIN F drain trench systems that typically are difficult to transport and install with current market solutions.”

According to the news release, the new system has lightweight modular sections that cut down installation time by up to 75% compared to polymer concrete frames. Rebar clips allow for easy attachments to rebar, as well as height adjustments. The longer, lightweight lengths have fewer joints and are durable enough for easy handling.

More information is available on the Zurn website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • New City School

    Turning Crisis into Opportunity: Transforming New City School

    When New City School in St. Louis suffered catastrophic flood damage in July 2022, the event could have marked a serious setback for the 100-year-old institution. Instead, it became a forward-looking opportunity.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • North Texas School District Completes Third New Elementary School

    The Denton Independent School District in Dallas, Texas, recently finished construction on its third prototype design elementary school, Reeves Elementary, according to a news release.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.