Addition & Alterations to Burnsville High School

ATS&R Planners/Architects/Engineers

Project of Distinction 2017 Education Design Showcase

Addition & Alterations to Burnsville High School

Project Information

Facility Use: High School
Project Type: Addition
Category: Classrooms/Academic Buildings
Location: Burnsville, MN
District/Inst.: Burnsville Public Schools
Chief Administrator: Joe Gothard Superintendent
Completion Date: 2016
Gross Area: 525,300 sq. ft.
Area Per Student: 188 sq. ft.
Current Enrollment: n/a
Capacity: 2,800 students
Cost per Student: $11,901.07
Cost per Sq. Ft.: $233
Total Cost: $33,323,000

Addition & Alterations to Burnsville High SchoolThe school’s pathway program helps to expose students to different opportunities and prepare them for their next steps. These welcoming building additions and zoning features support student and community business mentoring activities. Conference rooms and Flexible-Team-Learning-Areas offer a variety of meeting and workshop opportunities. Classrooms are designed without a defined front, and the furniture allows for maximum flexibility. The certified nursing assistant lab, for example, offers the experience of helping students to be a “test away” from certification.

The Commons is a public space that is an extension of the learning environment. Its other functions include student dining, expo space, performance area, as well as project demonstration space. The glass and overhead doors put learning “on-display”, showing to the community the creative projects students are developing.

The activities building addition includes additional gym space, overhead interior jogging track, sprint track, dance studio, cardio room, and weight room. These spaces work together to support health and fitness to a broader student and community base.

The process of this project was especially unique in how we engaged the community mentors and businesses in the design. There was a conscious effort to provide learning opportunities that would best prepare the students for their future. The design incorporated a Firefly credit union with an ATM. This space provides on-site space for mentoring opportunities in the banking profession. We consulted with a local car dealer ship in the design of the auto shop to better determine the right equipment and experiences that their business will be looking for from the future workforce. We included a variety of lifts and stations to enrich each experience. For the certified nursing program we met with the local community technical college to better understand how to equip the lab. The design was tailored not just for the school, students and teachers but also for the community, its businesses and the future workforce.

Addition & Alterations to Burnsville High School Addition & Alterations to Burnsville High School

Judges Comments

Nice input from industry experts in planning process. Attractive lighting. High-end appearance. Nice looking facility.

Architect(s):

ATS&R Planners/Architects/Engineers
ERIC ANDERSON, AIA/NCARB
763/545-3731

Featured

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Three U.S. Universities Install Acre Security Access Control Platform

    Cloud-native physical and digital security solutions company Acre Security recently announced that it has deployed its access control platform at three major universities in the U.S., according to a news release. Acre partnered with Atrium Campus to provide coverage for more than 69,000 students at the University of Virginia (UVA), George Mason University, and Rockhurst University.

  • Empowering People Through Smart, Sustainable Campuses

    Sustainability is facing increasing scrutiny, with some questioning its costs and priorities. Yet for universities, it remains an essential driver of resilience, operational efficiency and long-term competitiveness. At the same time, there is a growing recognition that sustainable transformation is not just about reducing energy consumption and emissions to comply with tightening regulations ‒ it’s about creating vibrant, comfortable environments where people can thrive, innovate and connect. For university leadership, this is a complex balancing act, with rising energy costs and limited budgets only adding to the challenge.