Addition & Alterations to Burnsville High School

ATS&R Planners/Architects/Engineers

Project of Distinction 2017 Education Design Showcase

Addition & Alterations to Burnsville High School

Project Information

Facility Use: High School
Project Type: Addition
Category: Classrooms/Academic Buildings
Location: Burnsville, MN
District/Inst.: Burnsville Public Schools
Chief Administrator: Joe Gothard Superintendent
Completion Date: 2016
Gross Area: 525,300 sq. ft.
Area Per Student: 188 sq. ft.
Current Enrollment: n/a
Capacity: 2,800 students
Cost per Student: $11,901.07
Cost per Sq. Ft.: $233
Total Cost: $33,323,000

Addition & Alterations to Burnsville High SchoolThe school’s pathway program helps to expose students to different opportunities and prepare them for their next steps. These welcoming building additions and zoning features support student and community business mentoring activities. Conference rooms and Flexible-Team-Learning-Areas offer a variety of meeting and workshop opportunities. Classrooms are designed without a defined front, and the furniture allows for maximum flexibility. The certified nursing assistant lab, for example, offers the experience of helping students to be a “test away” from certification.

The Commons is a public space that is an extension of the learning environment. Its other functions include student dining, expo space, performance area, as well as project demonstration space. The glass and overhead doors put learning “on-display”, showing to the community the creative projects students are developing.

The activities building addition includes additional gym space, overhead interior jogging track, sprint track, dance studio, cardio room, and weight room. These spaces work together to support health and fitness to a broader student and community base.

The process of this project was especially unique in how we engaged the community mentors and businesses in the design. There was a conscious effort to provide learning opportunities that would best prepare the students for their future. The design incorporated a Firefly credit union with an ATM. This space provides on-site space for mentoring opportunities in the banking profession. We consulted with a local car dealer ship in the design of the auto shop to better determine the right equipment and experiences that their business will be looking for from the future workforce. We included a variety of lifts and stations to enrich each experience. For the certified nursing program we met with the local community technical college to better understand how to equip the lab. The design was tailored not just for the school, students and teachers but also for the community, its businesses and the future workforce.

Addition & Alterations to Burnsville High School Addition & Alterations to Burnsville High School

Judges Comments

Nice input from industry experts in planning process. Attractive lighting. High-end appearance. Nice looking facility.

Architect(s):

ATS&R Planners/Architects/Engineers
ERIC ANDERSON, AIA/NCARB
763/545-3731

Featured

  • nursing students talk while studying in a hallway

    Elsevier Launches VR Simulation Solution for Nursing Students

    Elsevier has introduced Shadow Health Lab with Virtual Reality, a simulation platform that allows nursing students to interact with virtual patients and build clinical judgment skills in a safe, realistic environment.

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • University of Kansas Breaks Ground on Entrepreneurship Hub

    The University of Kansas in Lawrence, Kan., recently held a groundbreaking ceremony for the new KU Entrepreneurship Hub, according to university news. The Hub is part of the university’s School of Business and will include spaces for experiential learning and programming.