A Renovation Alternative

Like thousands of districts around the country, Merrill Community Schools, a district that serves over 800 students in Saginaw County, MI, faced tight budgets, inefficient building systems, and rising energy costs. But although the district wanted to make infrastructure improvements and cut its utility bills, it didn’t want to place an additional burden on the community. With no money to allocate to building renovations, the district started to search for alternative methods to tackle its facility and energy concerns.

Inevitable Changes
“We had 25-year-old technology with inefficient and failing heating systems,” said John Searles, superintendent of Merrill Community Schools. “Classrooms would be 85 degrees in the winter and doors would be open. We were literally paying to heat the outside.”

Combined with a leaky roof at the high school and recurring maintenance needs at the district’s other facilities, upgrades and renovations were essential. A 30 to 40 percent increase in utility prices also sparked an interest in looking at creative, renewable technology.

Merrill Community Schools chose Honeywell to help provide insight and solutions for their needs. The resulting project was made possible by an energy conservation improvement bond from the Michigan Municipal Bond Authority, which allows schools to implement performance contracts and provides the initial capital for improvement projects.

The district will save $1.4M in energy and operational costs because of the improvements. The company guarantees the energy savings will pay for the upgrades over the term of the 15-year contract, so the project will not affect the district’s operating budget.

Unique Upgrades
Based on the district’s desire for a renewable component, Honeywell installed a corn-burning boiler to heat the district’s middle school by turning bushels of corn into usable energy. The school is the first school in Michigan — and one of the first in the nation — to use this alternative fuel technology as its main source of heat.

The boiler, powered by 7,200 bushels of corn each year, will decrease the district’s reliance on fossil fuels and is expected to reduce annual energy costs by $10,000, a significant increase over the projected $2,000 the district would have saved with a new, traditional gas boiler.

Other renewable energy work includes the addition of a waste oil heater in the maintenance building, which will help the district realize more than $2,000 in annual energy savings. The heater will run on waste oil collected from the district bus garage, further decreasing the district’s reliance on natural gas.

Another significant project was upgrading the district’s existing control system to a facility management platform that integrates HVAC, security, life safety, and other core building functions. Through that system, the district can monitor and control individual pieces of HVAC equipment across the district from a single workspace.

In addition, the system immediately notifies facility personnel of any abnormality, such as a downed boiler or a classroom that becomes too hot, allowing the district to better deal with issues as they arise.

Honeywell also helped the district lower energy consumption and increase savings by:
  • installing energy-efficient lighting with occupancy sensors in all district buildings;
  • performing boiler tune-ups to ensure optimal performance; and
  • installing a new roof on the high school.



Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • concentric silhouettes of a human head

    How Physical Space Shapes the Mind: Designing for Better Learning Outcomes

    Research in environmental psychology and neuroscience increasingly suggests that the way a room is designed can influence memory, focus, or even a student's sense of belonging.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • T&T Construction Management Group Completes Pasco High School Expansion

    Pasco High School in Dade City, Fla., recently announced that it has completed an expansion project in partnership with T&T Construction Management Group, Inc., Harvard Jolly Architecture, and Williams Company.

Digital Edition