A Renovation Alternative

Like thousands of districts around the country, Merrill Community Schools, a district that serves over 800 students in Saginaw County, MI, faced tight budgets, inefficient building systems, and rising energy costs. But although the district wanted to make infrastructure improvements and cut its utility bills, it didn’t want to place an additional burden on the community. With no money to allocate to building renovations, the district started to search for alternative methods to tackle its facility and energy concerns.

Inevitable Changes
“We had 25-year-old technology with inefficient and failing heating systems,” said John Searles, superintendent of Merrill Community Schools. “Classrooms would be 85 degrees in the winter and doors would be open. We were literally paying to heat the outside.”

Combined with a leaky roof at the high school and recurring maintenance needs at the district’s other facilities, upgrades and renovations were essential. A 30 to 40 percent increase in utility prices also sparked an interest in looking at creative, renewable technology.

Merrill Community Schools chose Honeywell to help provide insight and solutions for their needs. The resulting project was made possible by an energy conservation improvement bond from the Michigan Municipal Bond Authority, which allows schools to implement performance contracts and provides the initial capital for improvement projects.

The district will save $1.4M in energy and operational costs because of the improvements. The company guarantees the energy savings will pay for the upgrades over the term of the 15-year contract, so the project will not affect the district’s operating budget.

Unique Upgrades
Based on the district’s desire for a renewable component, Honeywell installed a corn-burning boiler to heat the district’s middle school by turning bushels of corn into usable energy. The school is the first school in Michigan — and one of the first in the nation — to use this alternative fuel technology as its main source of heat.

The boiler, powered by 7,200 bushels of corn each year, will decrease the district’s reliance on fossil fuels and is expected to reduce annual energy costs by $10,000, a significant increase over the projected $2,000 the district would have saved with a new, traditional gas boiler.

Other renewable energy work includes the addition of a waste oil heater in the maintenance building, which will help the district realize more than $2,000 in annual energy savings. The heater will run on waste oil collected from the district bus garage, further decreasing the district’s reliance on natural gas.

Another significant project was upgrading the district’s existing control system to a facility management platform that integrates HVAC, security, life safety, and other core building functions. Through that system, the district can monitor and control individual pieces of HVAC equipment across the district from a single workspace.

In addition, the system immediately notifies facility personnel of any abnormality, such as a downed boiler or a classroom that becomes too hot, allowing the district to better deal with issues as they arise.

Honeywell also helped the district lower energy consumption and increase savings by:
  • installing energy-efficient lighting with occupancy sensors in all district buildings;
  • performing boiler tune-ups to ensure optimal performance; and
  • installing a new roof on the high school.



Featured

  • DLR Group Appoints New K–12 Education Practice Leader

    Integrated design firm DLR Group recently announced that it has named its new global K–12 Education leader, Senior Principal Carmen Wyckoff, AIA, LEED AP, according to a news release. Her teams have members in all 36 of the firm’s offices in the U.S., Puerto Rico, the U.S. Virgin Islands, Europe, and Asia.

  • UT System Board of Regents Approves $108M Housing Complex

    The University of Texas System Board of Regents recently announced the approval of a new, $108-million housing complex at the University of Texas at El Paso (UTEP), according to a news release. The facility will stand four stories and have a total of 456 new beds for freshmen students.

  • University of Kentucky Receives $150M Gift Toward New Arts District

    The University of Kentucky’s Board of Trustees recently received a $150-million gift from The Bill Gatton Foundation, according to a university news release, to build a new arts district on the campus in Lexington, Ky. The new district will feature a new College of Fine Arts building and a multi-hundred-seat theater, among other amenities.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition