Balancing Historic Architecture, Sustainablity and Modern Amenities

Elmhurst Community Unit School District 205, in Elmhurst, IL, welcomed the public to tour the newly renovated and expanded Hawthorne Elementary School. A special dedication to celebrate the completion of the school’s $16M makeover was held in September.

The building project included a two-story, 12-classroom addition (20,000 sq. ft.) and another 58,000 sq. ft. of renovations to the 90-year-old Hawthorne grade school. Its purpose was not only to provide more space for growing enrollment but also to modernize the teaching environment.

A notable design feature of the project was the preservation of the original historic façade within the two-story atrium between the existing building and the new addition. The changes to the building also incorporated sustainable design strategies such as permeable parking lot pavers, water-saving plumbing fixtures, and high efficiency lighting and mechanical systems.

Other project highlights included:
  • remodeling of existing classrooms with new ventilation systems, power and lighting systems, technology systems, finishes, and casework;
  • making improvements to the building envelope, including exterior window replacement, masonry restoration, and tuck pointing;
  • replacing all major mechanical systems with high-efficiency, energy-saving systems controlled by building automation;
  • remodeling art and music classrooms; and
  • providing abundant natural light through the use of window transoms and a large central skylight.
“Our challenge was to create a modern facility while maintaining the historical integrity and character of the oldest grade school in the District,” said Kevin Havens, Senior. Vice President and Director of Design, of Wight & Company.

The Elhurst district currently services more than 7,800 students who reside primarily in the city of Elmhurst and small portions of Oak Brook, Bensenville, and Addison. At present, District 205 maintains 13 schools (eight elementary schools, three middle schools, York Community High School, and an early childhood center).

The renovation and construction was managed by Wight & Company. For more information, visit www.wightco.com.

Featured

  • California Boarding School Opens New Inquiry Collaborative Facility

    Cate School, a boarding school in Carpinteria, Calif., for students grades 9–12, recently announced that it has finished renovating a historic dining hall into a new academic hub, according to a news release. The school partnered with Blackbird Architects and Tangram Interiors on the two-story, 16,000-square-foot Inquiry Collaborative.

  • Spaces4Learning Announces Winners of 2025 Product Awards

    Spaces4Learning has just announced the winners of the 2025 Product Awards! The award program recognizes innovation and excellence in products that enhance learning environments in K–12 schools and institutions of higher education.

  • AP Construction Breaks Ground on Two Projects for Austin ISD

    Adolfson & Peterson Construction (AP) recently announced that it has broken ground on two renovation projects for the Austin Independent School District, according to a news release. The work at McCallum and Anderson High Schools totals 97,350 square feet and is scheduled for completion in January 2027.

  • cutaway view of a modern school building, showing various rooms and zones

    Layering AI into HVAC Systems Shows Reduction in Carbon Emissions

    Heating and cooling systems are just one of the many new ways that AI can be integrated into schools. According to a new study from Schneider Electric's Sustainability Research Institute, AI-powered HVAC systems in schools can lead to significant carbon emissions savings.

Digital Edition