Flexible Music Rehearsal Environment

VAE Rehearal system 

The VAE Rehearal system allows students to transition easily between rehearsal and performance environments.

“Although we're physically rehearsing in our orchestra room, the VAE Rehearsal system makes it feel like we’re really rehearsing on our stage,” says Mark Gitch, Orchestra director at Wayzata High School (WHS) in Plymouth, Minn. Wenger’s Virtual Acoustic Environments (VAE) technology enhances and accelerates music learning by creating realistic acoustic simulations of performance spaces. Wenger engineers also simulated the WHS auditorium’s acoustics with a custom setting.

Gitch believes it’s difficult for musicians to make transitions between rehearsal and performance environments. Like most high schools, the WHS auditorium has many users with limited rehearsal time available.

“Regardless of their skill level, my students notice very similar effects of the VAE Rehearsal system on their rehearsal process,” says Gitch. He appreciated how rapidly students moved beyond enchantment with the technology to listening to themselves, and to each other, differently. “While the technology is fun and inspiring, students quickly found they also worked more intelligently during the rehearsal process,” he notes.

“Students are inspired when playing in a cathedral setting, for example, but they also learn to listen differently,” Gitch comments. “In a resonant environment, they’re listening to that last note a little longer and asking themselves: ‘Is that really the tone I wanted? Is that really the pitch I wanted? Maybe I should do that again…’”

Gitch describes the beauty of the VAE Rehearsal system as threefold. First, its simplicity makes the system very easy to use. Second, the system’s different acoustic environments offer flexibility. Finally, the digital record and playback capability works with any of the nine acoustical settings – for immediate listening in rehearsal, to save for future use or to create an audition recording.

“The VAE Rehearsal system enables a smooth transition between rehearsal and performances,” Gitch concludes.

www.wengercorp.com

This article originally appeared in the School Planning & Management November 2013 issue of Spaces4Learning.

Featured

  • Zurn Elkay Announces Updated Line of Filtered Bottle Filling Stations

    Zurn Elkay Water Solutions recently released an updated line of its Elkay Filtered Bottle Filling Stations, according to a news release. The new line features a sleeker design and functional upgrades to help simplify filter maintenance and reduce long-term labor costs.

  • DreamBox Math

    Discovery Education Debuts Enhancements to DreamBox Math

    Discovery Education recently announced that DreamBox Math, an online math program for K–8 students to supplement core instruction, has been updated to improve accessibility for K–5 students, according to a news release. DreamBox Math provides personalized instruction by adapting to individual learners’ responses and providing an engaging, dynamic learning environment.

  • Norfolk State University Partners with Voltus for Energy Efficiency Program

    Norfolk State University recently announced that it has selected Voltus, Inc., to implement the university’s new energy efficiency program on its campus in Norfolk, Va. According to a news release, the partnership’s goal is to reduce campus energy use by 27% by the year 2030 and support grid reliability across the state of Virginia.

  • Kimball International Debuts Health & Education Experience Center

    Kimball International recently opened a new facility at its corporate headquarters in Jasper, Ind., that will act as a hands-on showroom for a variety of its furniture products and solutions, according to a news release. The 13,000-square-foot Health & Education Experience Center was originally designed by Gensler as the headquarters for Kimball International’s National brand.