Palomar Modular Buildings Releases 'Seven Easy Steps In The Modular Building Process' White Paper

DESOTO, TX — Palomar Modular Buildings is releasing a white paper titled “Seven Easy Steps In The Modular Building Process.” The company’s white paper is a comprehensive guide that divides the modular building process into seven stages. Each stage of the modular building process is explained in detail to provide people unfamiliar with the modular construction industry insight into how a modular building is created.

The white paper covers building design, engineering, permits and approvals, site development, plant fabrication, transportation and installation. Whether you are building a portable classroom or a full man camp facility supporting 1,500 people, the development process involves the same steps.

The white paper can be found on the Palomar Modular Buildings website at palomarmodularbuildings.com.

The company’s modular construction process provides building developers with an environmentally friendly, low-waste, cost-effective structure in a fraction of the time it takes with conventional construction.

About Palomar Modular Buildings
Palomar Modular Buildings manufactures advanced modular buildings for a range of industries including office, retail, healthcare, education and workforce housing. The company’s state-of-the-art manufacturing facility in DeSoto, TX, is staffed with a dedicated full-time workforce of skilled tradesmen and production managers has produced hundreds of modular projects from simple additions to complex new facilities.

Featured

  • Inglewood Unified School District Breaks Ground on New High School

    The Inglewood Unified School District in Inglewood, Calif., recently broke ground on a new campus for Inglewood High School, according to a news release. The project has a budget of about $240 million, funding coming through bond proceeds from Measure I.

  • MiEN Releases White Paper on Community College Space Innovation

    MiEN Company recently released a new white paper called “Designing New Innovative Spaces for Community Colleges” to address the needs of community colleges post-pandemic, according to a news release. The eight-page guide by Dr. Christina Counts, MiEN Company VP of Education and Marketing, covers topics like the enrollment drop that these schools have seen since COVID-19, the roles they play in higher education and local workforces, and five suggested key changes that can improve students’ experiences.

  • Georgia High School Debuts 500-Seat Esports Arena

    Cass High School in Bartow County, Ga., recently announced the opening of a new, 7,000-square-foot Esports Arena, according to a news release. The Bartow County School System partnered with Extron AV Technology on the project.

  • Greenheck Launches New Series of Rooftop Units

    Air movement, control, and conditioning solutions provider Greenheck recently launched a new line of rooftop units that merge the conveniences of traditional rooftop ventilators and dedicated outdoor air systems, according to a news release. The Model RT controls temperature and humidity for indoor comfort.

Digital Edition