Fixtures Provide Significant Savings

Plumbing fixtures

When it came time to replace plumbing fixtures at CCSD 15 in Palatine, Ill. Moen made the grade with ease.

Plumbing fixtures may not be the first thing on school districts’ minds when it comes to providing a world-class education, but they’re a critical element for keeping schools running smoothly. Just ask Craig Phillips. He oversees the operation and care of all of the facilities at the Community Consolidated School District (CCSD) 15 in Palatine, which is the third largest pre-K-8 school district in Illinois.

As manager of Environmental Services at CCSD 15, Phillips needs to ensure he’s working with the right partners when making decisions that affect the district. Among Phillips’ numerous responsibilities are purchasing and maintaining the district’s plumbing systems.

So when the time came to replace aged fixtures and equipment, he knew he needed to select plumbing products that would be durable, reliable and hold up for years to come.

The Research: Phillips investigated several brands, developing a rigorous set of standards to compare products.

“I was familiar with Moen from residential projects I had completed at my own firm, so I knew that the brand’s products are of the highest quality,” Phillips says. “Once I learned about the value of Moen Commercial’s offerings, including their lower lifetime cost, I knew they were the right choice.”

The Solution: Phillips chose Moen Commercial for the quality and durability of the flush valves, and its self-cleaning piston technology. “Unlike other products in the market, M•Power doesn’t have a rubber diaphragm or other components that will wear out and need to be replaced, which can save the district money over the life of the flush valve,” says Phillips.

Since the first installation, Phillips and the district have been pleased with the performance.

“I haven’t had any problems or complaints – Moen gets my vote every time. It’s highly superb compared to other products in the marketplace,” he says.

www.moencommerical.com

This article originally appeared in the issue of .

Featured

  • North Dakota State University Completes Music School Renovation

    North Dakota State University in Fargo, N.D., recently announced that construction on the Challey School of Music has finished, according to a news release. The university partnered with Foss Architecture & Interiors for design and Kraus-Anderson for construction services, and construction began in July 2024.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

Digital Edition