Denver Public Schools found a way to promote sustainability and benefit their own construction projects with Armstong’s Recycling Program.

With the adoption of its Sustainability Management Plan, Denver Public Schools (DPS) is challenging students, teachers, staff, and parents to practice an “ethic of sustainability” to help reduce the impact its 185 schools have on the environment.

A major focus area of the plan calls for measurable improvements in landfill diversion rates and reduced greenhouse gas emissions from solid waste.

When renovations began on a 14-story office building DPS was converting to a vertical campus in downtown Denver, school officials met with the contractor to set sustainability goals for the project. “Recycling and repurposing of the materials that came out of the building was probably the number one item on that sustainability list,” explains DPS Construction Project Manager Katheryn Zeeb.

A large part of the construction waste consisted of old ceiling tiles that had been removed from the building during renovation. The contractor recommended that DPS recycle the old ceiling tiles through the Armstrong Ceiling Recycling Program.

The program enables building owners to ship discarded ceiling tiles from demolition and renovation projects to the nearest Armstrong plant as an alternative to landfill disposal. The discarded tiles are then used to manufacture new ceiling tiles.

Through its participation in the program, DPS eventually recycled over 131,000 square feet of used ceiling tiles, diverting nearly 67 tons of construction waste from landfills.

“The recycling program has proven to be advantageous from so many different levels – from savings on container costs and landfill fees to stewardship of resources for future generations,” says DPS Construction Services Director James Allen. “It’s been a good experience. Now that we’ve done it once, we’ll continue to do it. We’re a school district and we are life-long learners.”

www.armstrong.com

This article originally appeared in the issue of .

Featured

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • iPark 87

    Building a Future-Focused Career and Technical Education Center

    A district superintendent shares his team's journey to aligning student passions with workforce demands, and why their new CTE center could be a model for districts nationwide.

  • Preparing for the Next Era of Healthcare Education, Innovation

    Across the country, public universities and community colleges are accelerating investments in healthcare education facilities as part of a broader strategy to address workforce shortages, modernize outdated infrastructure, and expand clinical training capacity. These projects, which are often located at the center of campus health and science districts, are no longer limited to traditional classrooms.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

Digital Edition