Solutions for Cable Management

Many universities and colleges recognize the growing need to provide their students and faculty access to technology throughout the campus. However, many historic campuses date back to the mid-1850s, with many of the current academic and administrative buildings having been built in the 1950s, 1960s and 1970s. Due to the age of much of the infrastructure most universities are ill equipped to conveniently bring power, data and A/V access to where it is needed for today’s technology.

Finding the solution needed to bring power, data and A/V access and cable management to every classroom, library and office can be a daunting task, and often core drilling is seen as the only option. Core drilling involves drilling holes in the concrete floor slab, installing conduits through these holes and routing them beneath the floor slab to the new poke-through device. With trenching, a portion of the concrete floor slab is saw-cut and removed. Conduits and electrical devices are put in place and the floor slab is then patched with new concrete. Many are discovering, though, that the costs of core drilling and trenching are too expensive. According to a recent RSMeans study, avoiding core drilling or trenching and using an alternative method can save 50 percent or more.

The growing need for retrofitting campuses is unabated and institutions must think beyond solutions invented nearly a century ago. The keys to success are to effectively and affordably bring power, data and telecommunications from the wall to wherever it is needed while having the flexibility to adjust and grow as technology continues to evolve.

This article originally appeared in the issue of .

About the Author

Clint Strong, CEO of Connectrac® (www.connectrac.com), is the company’s founder and a licensed architect. Connectrac is the new standard in modular, bringing cable management in all interior applications, supplanting expensive core drilling with its floor-based wireway. Contact Clint at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition