Construction Underway for Housatonic Community College Expansion

Construction Underway for Housatonic Community College ExpansionBRIDGEPORT, CT – Construction has started for the expansion and renovation to Lafayette Hall at Housatonic Community College (HCC).

The Bridgeport, CT, college moved to its current location in 1997. At that time, the college had approximately 2,700 students enrolled and immediately experienced a significant enrollment increase. Current enrollment is 5,369 students.

To accommodate HCC’s steady growth, the college opened its second building, Beacon Hall, at the southern perimeter of the campus in 2008. The additional 174,500 square feet added classrooms, offices, a large multi-use Events Center, Wellness Center, Students Activities Center and enlarged bookstore.

Continuing its pattern of growth, the current 46,000-square-foot addition will create a new Welcome Center, enabling students to move more easily through the enrollment and registration process. Renovated spaces will also enlarge the college library, academic support center, new science labs and additional offices for student services.

HCC President Paul Broadie says, “The new space will allow us to expand academic programs and provide new ones to meet today’s employment requirements. We are projecting adding programs specifically in STEAM (Science, Engineering, Arts, Math) courses.

The $37.5 million project is expected to create over 600 construction-related jobs.

The college will continue all normal procedures and activities throughout the construction process.

Construction is expected to be completed in 2017, in time for the college’s 50th anniversary.

Featured

  • Thomas F. Frist, Jr. College of Medicine

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Thomas F. Frist, Jr. College of Medicine has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

  • Singlewire Software Report Reveals Gaps in K–12 School Entrance Security

    Single Software recently released its first-ever School Entrance Security Report based on more than 500 responses from U.S. school staff members. According to a news release, the findings highlight a gap between K–12 leaders’ wishes for school safety and how safe the schools actually are, as well as the challenges facing students and staff in that goal.

  • Fellowes Launches New 3D Modular, Product Configurators

    Contract interiors and architectural solutions provider Fellowes recently announced the launch of new 3D modular and product configurators for several of its product lines, according to a news release. The new products offer SIF file integration and pricing for the Volo, Markerboards, Sena, and Rising product lines in connection with 3D Cloud, which provides 3D product visualization and 3D digital asset management.

  • Inglewood Unified School District Breaks Ground on New High School

    The Inglewood Unified School District in Inglewood, Calif., recently broke ground on a new campus for Inglewood High School, according to a news release. The project has a budget of about $240 million, funding coming through bond proceeds from Measure I.

Digital Edition