HVAC Makes Energy Usage Easy to Manage

HVAC system

A quick installation and the ability to control energy usage made Mitsubishi Electric’s HVAC system an easy choice when it came time to replace an inefficient system at Screven Elementary School.

Screven Elementary School in Sylvania, Ga., serves 1,400 Pre-K to fifth-graders. The 143,000-square-foot facility was built in 1989. A renovation of the school in 2002 took care of many issues, but left a dated and inefficient HVAC system sorely needing replacement. A CITY MULTI Variable Refrigerant Flow (VRF) zoning system from Mitsubishi Electric US, Inc. Cooling & Heating Division (Mitsubishi Electric) provided an efficient, cost-saving solution.

The pipes of the building’s original water-source heat pump system eventually deteriorated. William Bland, superintendent, Screven County School System, says, “There was no question about the need for a renovation of the HVAC system at the elementary school.”

Pruett, Ford & Associates, Inc., Augusta, Ga., was called in to specify the system. Bob Pruett, partner, supported the choice of a Mitsubishi Electric system because “we felt it would be less maintenance.” If one part of the previous system needed to be serviced, the whole system had to be shut down. “The Mitsubishi Electric system is compartmentalized, though, so if you lose a compressor you might lose part of a system, but never the whole system,” says Pruett.

The installation, completed in less than 12 weeks, took place over the summer when school was not in session. Dixon says, “It went unbelievably. If there was a problem we made a phone call and someone was there — more times than not — within the same day. It was remarkable.”

The VRF system allows Preston Dees, director of school safety and energy manager, Screven County School System, to monitor and control the cooling and heating in each classroom. Dees says, “Now we’re on a control system and we can manage our energy usage.” Controlling energy usage throughout the school from a centralized controller offers ease and cost savings. The savings in the first two years post-renovation have been substantial.

www.mehvac.com

This article originally appeared in the issue of .

Featured

  • StarRez Releases 2025 State of Student Housing Report

    Student housing software solutions provider StarRez recently released its second State of the Student Housing Industry Report, according to a news release. The report is based on the results of survey data from more than 400 higher education institutions around the world, both StarRez clients and not.

  • AP Construction Breaks Ground on Two Projects for Austin ISD

    Adolfson & Peterson Construction (AP) recently announced that it has broken ground on two renovation projects for the Austin Independent School District, according to a news release. The work at McCallum and Anderson High Schools totals 97,350 square feet and is scheduled for completion in January 2027.

  • New Kent State Academic Building Earns LEED Silver Certification

    Kent State University in Kent, Ohio, recently announced that its newest academic building, Crawford Hall, has earned a LEED Silver certification from the U.S. Green Building Council, according to a news release. The facility was recognized for its innovative design, water conservation technologies, energy-efficient systems, and sustainable construction materials, among other features.

  • Anderson Brulé Architects Rebrands as ABA Studios

    Anderson Brulé Architects, based in San Jose, Calif., recently announced that it is celebrating 40 years of service by rebranding under a new name, according to a news release. The architectural, interior design, and planning firm will now be known as ABA Studios to refresh its identity underneath a new generation of leadership.

Digital Edition