Texas Band Director Helps Demonstrate Acoustics Technology for Music Education in San Antonio

San Antonio, Texas — To practice football, players go to the field. To practice tennis, players visit the tennis court. It’s logical – the best place to practice is where they play. However, musicians usually cannot rehearse in their performance space. Until now!

Innovative virtual acoustics technology is opening up new possibilities. On Feb.y 12, in a band director from San Angelo will highlight the solution recently installed in his band room.

What:

Demonstration of “virtual acoustics” technology for music education, which simulates a variety of performance environments to accelerate learning and preparation for concerts/contests. 2,100-sq.-ft. hotel conference room will feature 20 speakers + 2 microphones, mounted on temporary trussing and controlled by digital signal processor computer.

Where:

The Pavilion by Hilton, 200 S. Alamo Street, San Antonio. Adjacent to the Texas Music Educators Assoc.(TMEA) Clinic/Convention at the Gonzalez Convention Center. TMEA is the largest event of its kind in the country, attracting 26,000 people, more than 1/3 are active music educators. The TI:ME Music Technology National Conference is held concurrently.

When:

Friday, Feb. 12. Presentations run every 30 minutes during four sessions:
1) 7:30am-9:30am (breakfast served); 2) 11:30am-1:30pm (lunch served);
3) 2:30pm-4pm (refreshments); 4) 5:00pm-7:00pm (cocktail reception).

Pre-registration is encouraged because seating is limited. Attendees do not need to be registered for the TMEA Convention or TI:ME Conference.

Who:

Veteran band director Joel Ashbrook from Central High School in San Angelo, Texas, will join personnel from Wenger Corp. in explaining the system he’s been using at his school since the fall of 2015.

Ashbrook says, “The VAE Rehearsal System is outstanding – my students can actually experience playing in a performance environment: maintaining rhythm, tuning and pitch across the band.”

To see him interviewed for a KIDY-TV (San Angelo, Texas) story on Central HS’ technology, visit: https://youtu.be/oAc9-UNjdKI

Media Contact:

For more information, contact Warren Djerf at [email protected].

Featured

  • Kenall Introduces Millenium Flair Series

    In a move aimed at modernizing institutional lighting without compromising on durability or performance, Kenall has launched its new Millenium Flair series, according to the Kenall website.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • Dallas ISD Debuts New Peabody Elementary School

    The Dallas Independent School District in Dallas, Texas, recently announced the completion of the new facility for George Peabody Elementary School, according to a news release. The district partnered with Pfluger Architects and REEDER Construction on the 70,807-square-foot replacement campus, which has the capacity for 550 students.

  • cutaway view of a modern school building, showing various rooms and zones

    Layering AI into HVAC Systems Shows Reduction in Carbon Emissions

    Heating and cooling systems are just one of the many new ways that AI can be integrated into schools. According to a new study from Schneider Electric's Sustainability Research Institute, AI-powered HVAC systems in schools can lead to significant carbon emissions savings.

Digital Edition