Texas Band Director Helps Demonstrate Acoustics Technology for Music Education in San Antonio

San Antonio, Texas — To practice football, players go to the field. To practice tennis, players visit the tennis court. It’s logical – the best place to practice is where they play. However, musicians usually cannot rehearse in their performance space. Until now!

Innovative virtual acoustics technology is opening up new possibilities. On Feb.y 12, in a band director from San Angelo will highlight the solution recently installed in his band room.

What:

Demonstration of “virtual acoustics” technology for music education, which simulates a variety of performance environments to accelerate learning and preparation for concerts/contests. 2,100-sq.-ft. hotel conference room will feature 20 speakers + 2 microphones, mounted on temporary trussing and controlled by digital signal processor computer.

Where:

The Pavilion by Hilton, 200 S. Alamo Street, San Antonio. Adjacent to the Texas Music Educators Assoc.(TMEA) Clinic/Convention at the Gonzalez Convention Center. TMEA is the largest event of its kind in the country, attracting 26,000 people, more than 1/3 are active music educators. The TI:ME Music Technology National Conference is held concurrently.

When:

Friday, Feb. 12. Presentations run every 30 minutes during four sessions:
1) 7:30am-9:30am (breakfast served); 2) 11:30am-1:30pm (lunch served);
3) 2:30pm-4pm (refreshments); 4) 5:00pm-7:00pm (cocktail reception).

Pre-registration is encouraged because seating is limited. Attendees do not need to be registered for the TMEA Convention or TI:ME Conference.

Who:

Veteran band director Joel Ashbrook from Central High School in San Angelo, Texas, will join personnel from Wenger Corp. in explaining the system he’s been using at his school since the fall of 2015.

Ashbrook says, “The VAE Rehearsal System is outstanding – my students can actually experience playing in a performance environment: maintaining rhythm, tuning and pitch across the band.”

To see him interviewed for a KIDY-TV (San Angelo, Texas) story on Central HS’ technology, visit: https://youtu.be/oAc9-UNjdKI

Media Contact:

For more information, contact Warren Djerf at [email protected].

Featured

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • restroom sinks

    CSU Dominguez Hills Standardizes Plumbing to Improve Restroom Maintenance and Efficiency

    At California State University, Dominguez Hills, facilities leaders have taken steps to standardize restroom fixtures as part of a broader effort to improve maintenance efficiency and control long-term costs.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition