New 'Virtual Acoustics' Technology for Music Education

SAN ANTONIO, TX – To practice football, players go to the field. To practice tennis, players visit the tennis court. It’s logical — the best place to practice is where they play. However, musicians usually cannot rehearse in their performance space. Until now!

Innovative “virtual acoustics” technology is opening up new possibilities. On February 12th in San Antonio, TX, a band director from San Angelo will highlight the solution recently installed in his band room: VAE® Rehearsal System from Wenger.

What:  Demonstration of “virtual acoustics” technology for music education, which simulates a variety of performance environments to accelerate learning and preparation for concerts/contests. 2,100-sq.-ft. hotel conference room will feature 20 speakers + 2 microphones, mounted on temporary trussing and controlled by digital signal processor computer.

Where:  The Pavilion by Hilton, 200 S. Alamo St., San Antonio. Adjacent to the Texas Music Educators Assoc. (TMEA) Clinic/Convention at the Gonzalez Convention Center. TMEA is the largest event of its kind in the country, attracting 26,000 people; more than 1/3 are active music educators. The TI:ME Music Technology National Conference is held concurrently.

When: Friday, Feb. 12. Presentations run every 30 minutes during four sessions:

  • 7:30 a.m. to 9:30 a.m. (breakfast served)
  • 11:30 a.m. to 1:30 p.m. (lunch served)
  • 2:30 p.m. to 4 p.m. (refreshments)
  • 5:00 p.m. to 7:00 p.m. (cocktail reception)

Pre-registration is encouraged because seating is limited. Attendees do not need to be registered for the TMEA Convention or TI:ME Conference.

Featured

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.

  • Rhode Island Boarding School Completes Student Dorm Renovations

    St. George’s School in Middletown, R.I., recently announced the completion of a $26-million renovation project on Arden-Diman-Eccles Dormitory, according to a news release. The school partnered with Voith & Mactavish Architects (VMA) on the new space, which places a new focus on collaborative community spaces open to both boarding students and day students.

  • Geometric abstract school illustration

    How Design Shapes Learning and Success

    Can the color of a wall, the curve of a chair, or the hum of fluorescent lights really affect how a student learns? More schools are beginning to think so.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.