New 'Virtual Acoustics' Technology for Music Education

SAN ANTONIO, TX – To practice football, players go to the field. To practice tennis, players visit the tennis court. It’s logical — the best place to practice is where they play. However, musicians usually cannot rehearse in their performance space. Until now!

Innovative “virtual acoustics” technology is opening up new possibilities. On February 12th in San Antonio, TX, a band director from San Angelo will highlight the solution recently installed in his band room: VAE® Rehearsal System from Wenger.

What:  Demonstration of “virtual acoustics” technology for music education, which simulates a variety of performance environments to accelerate learning and preparation for concerts/contests. 2,100-sq.-ft. hotel conference room will feature 20 speakers + 2 microphones, mounted on temporary trussing and controlled by digital signal processor computer.

Where:  The Pavilion by Hilton, 200 S. Alamo St., San Antonio. Adjacent to the Texas Music Educators Assoc. (TMEA) Clinic/Convention at the Gonzalez Convention Center. TMEA is the largest event of its kind in the country, attracting 26,000 people; more than 1/3 are active music educators. The TI:ME Music Technology National Conference is held concurrently.

When: Friday, Feb. 12. Presentations run every 30 minutes during four sessions:

  • 7:30 a.m. to 9:30 a.m. (breakfast served)
  • 11:30 a.m. to 1:30 p.m. (lunch served)
  • 2:30 p.m. to 4 p.m. (refreshments)
  • 5:00 p.m. to 7:00 p.m. (cocktail reception)

Pre-registration is encouraged because seating is limited. Attendees do not need to be registered for the TMEA Convention or TI:ME Conference.

Featured

  • T&T Construction Management Group Completes Pasco High School Expansion

    Pasco High School in Dade City, Fla., recently announced that it has completed an expansion project in partnership with T&T Construction Management Group, Inc., Harvard Jolly Architecture, and Williams Company.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

Digital Edition