Henry Sibley High School

Project Snapshot

PROJECT: Henry Sibley High School
LOCATION: Mendota Heights, Minn.
COMPANY NAME: Wenger Corporation
WEBSITE: www.wengercorp.com

Henry Sibley High School

Prior to the reorganization and addition of equipment cabinets, the media storage room was messy, disorganized and even a bit dangerous. Now, students and staff can find what they need when they need it.

THE CHALLENGE

Henry Sibley High School’s media storage room was a mix of old library shelves, second-hand cabinets and a used pegboard. Multiple users and events made organization difficult, as equipment was piled and stacked haphazardly.

THE SOLUTION

Wenger evaluated the size of the AV storage room and the equipment being stored before making recommendations. Then Wenger provided a variety of fixed and mobile media storage cabinets designed to accommodate every piece of AV equipment.

Three models of fixed cabinets were installed — standard, rackmount and organizer — with a variety of shelves, drawers and options. The organizer model features a wire grid inside the door and back panel designed to accommodate hooks, and other accessories: baskets, cable minders, mic stand holders and CD racks.

“Our new cabinet solution is night and day better than what we had before,” declares Dann Hurlbert, AV Specialist & Film Studies Instructor. “The cabinets are beautiful and really help keep the room looking clean.”

Henry Sibley High School

BEFORE

The room still contains the same equipment as before, but everything is organized in designated locations and out of sight. Space utilization also improved dramatically.

IMPACT ON LEARNING

Organizing and safeguarding all this valuable equipment helps ensure it will be available and operational when needed throughout the school. AV equipment represents a sizable investment, often acquired over multiple budget years. Hurlbert appraises HSHS’ inventory at more than $50,000, including two LCD projectors, four speakers, a mixer and “lots of little things that add up.”

He sees a growing proliferation of AV equipment today — equipment components are becoming smaller and more numerous. This makes organization more challenging, and more essential.

Editor’s Review

We often do not realize that AV equipment can become unwieldy and take up many square feet of storage space. In the changing education environment, with the need for alternative learning spaces, etc., using available space in an efficient manner is always welcome. In this instance, the school administrators were able to better utilize the storage space, provide a more secure storage arrangement for expensive equipment and, as a bonus, by having it so much better organized, free up students’ and teachers’ time for longer instruction and rehearsals.

This article originally appeared in the issue of .

Featured

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

Digital Edition