Defense Starts At the Entrance

Flooring is usually the first thing that is regularly compromised, especially at high-traffic entrances. Quick fixes using carpet tiles are often preferred, but are they always the best, cost-efficient approach? Your entrance is where the first line of defense should start for trapping dirt and water. Too often, less expensive alternatives like carpet tiles only add to the problem.

The flooring product industry has changed significantly and it will never stop changing, but the one thing that will be consistent is the significant role entrance flooring systems play to ensure the entrance is kept clean and safe for building users and maintenance staff.

Entrance flooring systems play an integral part by helping to keep the entrance safe from slip, trips and falls while providing exceptional defense for managing dirt and water entering your building. When dirt and water are introduced to carpet tiles, significant wear begins to occur, usually requiring frequent replacement and becoming costly after time. The purpose of all entrance flooring systems is to allow dirt and water to fall through the system, trapping debris underneath the system while keeping the top surface clean. These systems partner well with many types of conditions, depths and flooring products. Employing an entrance flooring system in a recessed pit allows for a smooth transition from one top surface to another and are also available for surface mounted applications using specific ADA-compliant frame options.

Entrance flooring systems combine design and functionality with an array of insert and logo options, including the ability to work with other types of surrounding flooring materials to optimize a positive first impression.

Now is the time to integrate an entrance flooring system in your new or existing building and win the war on dirt.

This article originally appeared in the issue of .

About the Author

Renee Hite is the assistant Business Development manager for interior wall protection at Construction Specialties. To learn more visit www.c-sgroup.com, call 800/233-8493 or email Renee at [email protected].

Featured

  • Thomas F. Frist, Jr. College of Medicine

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Thomas F. Frist, Jr. College of Medicine has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

  • The Role of Unified Communications in Hyflex Education

    Academic technology and pedagogy have evolved in ways few could have imagined a decade ago. Today, hybrid/flexible (or hyflex) learning environments — a mix of in-person and remote instruction — are the new normal. However, as promising as it sounds, making hyflex work smoothly is no small feat.

  • California Middle School Completes Two New Academic Buildings

    Sunnyvale Middle School in Sunnyvale, Calif., recently announced that construction is complete on two new classroom buildings of two stories each, according to a district news release. The new wing will house seventh- and eighth-grade students and is part of a larger campus modernization project.

  • Image courtesy of MiEN Company

    6 Ways to Pull Off a Major District Construction Project

    Designing and building a large-scale project on a K–12 campus is a monumental undertaking that requires the right blend of ideas, funding, design and execution to get it right. The process also relies on multiple partners, each of which has to handle its respective aspect of the project while also keeping the district’s broader mission and goals in mind.

Digital Edition