Low Maintenance Floors for Cleaner Air

Low Maintenance Floors

The absence of fumes often associated with the application of flooring has positively impacted the well being of the maintenance staff, as well as students and teachers.

Christa McAuliffe Elementary School in Concord, N.H., is one of three new, futuristic elementary schools designed to meet the changing needs of 21st-century learning. Throughout the facility, norament grano rubber flooring supports a vision of open, collaborative, flexible and technology-integrated multi-use learning spaces.

“The facility is not only an elementary school, but also a community building that is heavily used before and after school for several town programs, such as the Boys & Girls Club,” says Matt Cashman, director of Facilities & Planning. “The durability and increased stain resistance — without the use of chemical cleaners or coatings — is a huge benefit realized by our district, when compared to our previous dealings with VCT.” The selection of nora flooring also helped the district meet Northeast-CHPS standards of sustainability.

“The elimination of coatings and chemicals has been a breath of fresh air, literally,” says Rusty Bonner, head custodian. The absence of fumes often associated with the application of these substances has positively impacted the well being of the maintenance staff, as well as students and teachers. “Just a few regular washes with little more than water erases any staining, allowing the floors to easily maintain their new appearance,” says Bonner. This is especially beneficial in spill-prone areas, including the cafeteria and art rooms. “It’s an easy-maintenance flooring,” says Bonner. “As a result, we can devote more time to cleaning alternate surfaces, such as glass.”

The rubber flooring also plays an important role where acoustics are concerned. Open project areas throughout the school, including an amphitheater, circular story room, reading nooks and spaces for small group work complemented by smartboards, benefit from the floor’s ability to attenuate unwanted ambient noise. Students and staff can better focus on listening and learning.

www.nora.com/us

This article originally appeared in the issue of .

Featured

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

  • University of West Florida Opens New Laboratory Facility

    The University of West Florida recently announced that renovation work is complete on a new lab building for its campus in Pensacola, Fla., according to university news. Building 80 will serve as the home to the university’s civil engineering program and the Tyler Chase Norwood Construction Management Program.

  • Pudu Robotics Launches AI-Powered, Large-Scale Floor Sweeper

    Pudu Robotics recently launched the newest member of its MT1 series of robotic floor sweepers, the PUDU MT1 Max, according to a news release. The AI-powered, 3D perception robotic sweeper was designed for use in large, complex cleaning environments both indoors and semi-outdoors, like parking garages and semi-open building atriums.

Digital Edition