How to Increase Access to Power in the Classroom

Most students use mobile electronics to learn. With that, students are more often finding themselves in difficult situations where they’re watching their smart phone, laptop and tablet batteries drain without an accessible power outlet nearby. The trend contributes to a rising epidemic of disengagement and lack of focus in the classroom.

Installing power sources can be costly and time consuming. Traditional construction methods like trenching, coring and raising floors can render classrooms unusable for extended periods of time. Often the cost is prohibitive. An alternative solution can be found in ultra-thin power grids laid seamlessly under carpet. This option is designed to provide learning spaces with power where and when students and instructors need it. Unlike other techniques, it requires no upheaval of existing structures and is a simpler and cost-efficient power distribution system.

Steelcase Research has revealed that 70 percent of students are taking notes on laptops instead of paper. In higher education, this number is even larger, as 95 percent of institutions allow mobile devices in classrooms. Not surprisingly, 20 percent of college students say it is difficult to charge their devices on campus. While schools are attempting to be “bring your own device friendly,” their classrooms and other campus spaces lack the easy connection to available electricity.

People need technology and technology needs power. As we ask how we can better meet student’s needs, we need to consider the spaces they are using. Instead of making students go to the power source, let’s bring the power to them and create more efficient, less distracting learning environment.

>> Through evidence-based design, technology and innovative solutions, Steelcase Education is focused on helping schools create the most effective, rewarding and inspiring active learning environments.

This article originally appeared in the issue of .

Featured

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • Geometric abstract school illustration

    How Design Shapes Learning and Success

    Can the color of a wall, the curve of a chair, or the hum of fluorescent lights really affect how a student learns? More schools are beginning to think so.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

Digital Edition