Flooring's Role in Acoustics

When it comes to improving in-class student learning and teacher instruction, multiple factors must be considered. One important factor that should not be overlooked is acoustics.

A number of studies show there is a direct correlation between acoustics and improved student performance. In fact, research shows products with high Noise Reduction Coefficients (NRC) and Impact Insulation Classifications (IIC) promote better voice recognition in the classroom. Inappropriate levels of background noise and reverberations can hinder reading and spelling ability, affect behavior and attention and affect concentration and academic performance.

Laboratories typically use two tests to measure the acoustic properties of interior surfaces and finishes: airborne noise reduction and structure-borne noise reduction.

The airborne noise reduction test, ASTM C423-02a, measures a surface’s ability to absorb airborne sounds, which contribute to ambient (background) noise. A floor covering’s measure of effectiveness in absorbing airborne sound is expressed as a Noise Reduction Coefficient (NRC). The greater the NRC, the better that product is at absorbing airborne sounds.

The structure-borne noise reduction test most used for flooring is ASTM E492-09. This test measures the material’s ability to reduce impact sound transmission into the space below. This test is important to perform on flooring materials selected for multilevel school buildings. Flooring products undergoing this test are expressed as a whole number, the Impact Insulation Class (IIC). The higher the rating the greater the sound insulation.

Soft floor covering materials such as carpet or textile composite flooring are excellent solutions for reducing both airborne and structureborne noise. They have the ability to absorb more sound and transmit less sound than other types of surfaces.

This article originally appeared in the issue of .

About the Author

Bob Bethel is the director of Business Development, Education, for J+J Flooring Group. J+J offers an online calculator, floorlifecost.com. Bob can be reached at [email protected] or 800/241-4586.

Featured

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • Longwood University Selects Builder for $73M Performing Arts Center

    Longwood University in Farmville, Va., recently announced that it has selected Swedish construction company Skanska as the builder of its new performing arts center, according to online news. The project involves the demolition of the current building and constructing a new, 64,500-square-foot facility.

  • South Texas K–12 District Debuts Region’s First Electric Bus Fleet

    The Valley View Independent School District in Pharr, Texas, recently announced a partnership with Highland Electric Fleets to launch the district’s—and the region’s—first fleet of all-electric school buses, according to a news release.

Digital Edition