Finding the Right Roof

roof

Finding a roof that could not only last for a long time but look good and match the existing metal was a challenge for West Liberty High School. Duro-Fleece 60-mil membrane provided both and proved the right choice for the job.

West Liberty High School was designed to put all of the district’s K-12 students under one roof. And it’s a big roof. Built in 1988, the school in the central-Ohio village of West Liberty began a $30-million renovation project in 2015. The goal was to upgrade into a state-of-the-art high school. According to Superintendent Kraig Hissong, the project encompasses just about every facet of the building, from 22,000 square feet of new space and technology upgrades to updated windows, HVAC and a new roof.

“Finding a roof that could not only last for a long time but look good and match the existing metal was both a priority and challenge for us,” Project Architect Melissa Spires says. The roofing contractor selected — Ohio-Indiana Roofing of Springfield, Ohio — specified Duro-Last’s DuroFleece 60-mil membrane in a custom color — taupe. The Duro-Fleece 60-mil membrane was adhered, with a water-based adhesive, to glass-faced Hunter Panels polyisocyanurate insulation mechanically attached to the deck. The existing roof was a ballasted EPDM single-ply roofing system. Due to the large area of the roof, the installation was scheduled to take place over two summers.

However, Ohio-Indiana completed the entire project during the summer of 2015 before classes started. Superintendent Hissong had spoken to other school administrators who have used Duro-Last products on their roofs and had confidence in the system. “We’re very happy with the way the roof went on,” he says. “The color match is excellent, and the installation is very nice. The roof looks great and matches the metal soffit as intended. Getting the project done early was an added bonus.”

Spires was also confident in the choice. “Because this was a publicly bid project that called for PVC, we are often required to go with the lowest bid,” she says. “We’re very pleased that Duro-Last was selected, as it was one of our top choices.

duro-last.com

This article originally appeared in the issue of .

Featured

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • University of Southern Mississippi Starts Construction on Oyster Hatchery

    The University of Southern Mississippi (USM) recently announced that construction has begun on a new oyster hatchery at its Gulf Coast Research Laboratory (GCRL) Thad Cochran Marine Aquaculture Center (TCMAC) Cedar Point campus in Ocean Springs, Miss., according to a news release.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • South Texas K–12 District Debuts Region’s First Electric Bus Fleet

    The Valley View Independent School District in Pharr, Texas, recently announced a partnership with Highland Electric Fleets to launch the district’s—and the region’s—first fleet of all-electric school buses, according to a news release.

Digital Edition