Putnam High School Renovation Complete

Putnam High SchoolTorrington, Conn. –  Putnam High School in Putnam, Conn., recently completed a $36.6-million, 98,000-square-foot, renovate-as-new project that began in the fall of 2014.  The scope of the project included replacing windows, renovating science labs, expanding the gymnasium, transforming the existing library into a multi-media center and upgrading the mechanical infrastructure of the 60-year-old building.

“During the course of this project we performed a comprehensive renovation that upgraded the school’s facilities to that of a modern educational environment.  In the areas that were touched by the renovation we removed all of the structure down to the outer shell of the building.  Then we reconstructed the facility with all new components” said Ken Biega, assistant vice president of O&G Industries.  “We will also address challenges such as the lack of natural light, bring outdated systems up to code, incorporate energy efficient design features and expand areas such as the gymnasium that no longer meet the school’s needs.”

The project team included construction manager O&G Industries of Torrington, Connecticut and project architect Drummey Rosane Anderson (DRA Architects) of South Windsor, Connecticut.

About O&G Industries, Inc.
O&G is Connecticut’s largest privately-held construction company, one of the country’s Top 400 Contractors and a Top 100 Green Building Contractor.  Visit www.ogind.com.

About Drummey Rosane Anderson (DRA Architects)
DRA is a thriving firm of 30 architects, planners, interior designers and construction administrators.  We specialize in educational, municipal, recreational, and institutional design. Visit www.draarchitects.com.

Featured

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

  • Pudu Robotics Launches AI-Powered, Large-Scale Floor Sweeper

    Pudu Robotics recently launched the newest member of its MT1 series of robotic floor sweepers, the PUDU MT1 Max, according to a news release. The AI-powered, 3D perception robotic sweeper was designed for use in large, complex cleaning environments both indoors and semi-outdoors, like parking garages and semi-open building atriums.

  • University of West Florida Opens New Laboratory Facility

    The University of West Florida recently announced that renovation work is complete on a new lab building for its campus in Pensacola, Fla., according to university news. Building 80 will serve as the home to the university’s civil engineering program and the Tyler Chase Norwood Construction Management Program.

Digital Edition