Construction of Interim Science Building Completed at Saint Louis University

St. Louis Science BuildingMcCarthy Building Companies, Inc. has completed the conversion of a former charter elementary school into an interim science building for Saint Louis University (SLU). The 50,000-sq.-ft. renovation, which was undertaken and opened in time for fall 2017 semester, now houses research, teaching and office space for the University’s Department of Biology. Located on SLU’s South Campus, the new facilities will serve students, researchers and faculty while the University renovates Macelwane Hall, which experienced a fire and subsequent water damage in May 2017.

McCarthy completed the fast-track construction project in seven weeks to ensure the building would be ready for the start of classes on August 28.

“We quickly mobilized our team and collaborated closely with SLU’s staff and Fox Architects to convert the vacant school into a state-of-the-art science learning environment,” says Ryan Freeman, vice president at McCarthy Building Companies. “The project involved a lot of hands-on ingenuity and innovation to meet the very quick timeframe.”

To avoid project delays and reduce costs, the construction team proactively surveyed and sourced laboratory casework and equipment salvaged from the fire, then reworked it to fit the programs and layout in the new spaces. 

Located at the corner of Spring and Chouteau Avenues, the former Imagine charter elementary school building required installation of lab exhaust and other systems and equipment, as well as extensive rework of mechanical and electrical systems to accommodate advanced research and teaching labs. 

“We relied on McCarthy’s efficiency and specialized expertise in building complex research and education spaces to complete the project on time,” says Dustin Montgomery, assistant director of construction services of Saint Louis University.

Featured

  • University of Southern Mississippi Starts Construction on Oyster Hatchery

    The University of Southern Mississippi (USM) recently announced that construction has begun on a new oyster hatchery at its Gulf Coast Research Laboratory (GCRL) Thad Cochran Marine Aquaculture Center (TCMAC) Cedar Point campus in Ocean Springs, Miss., according to a news release.

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

Digital Edition